Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the replacement and installation of approximately 1,430 feet of 6-inch ductile iron water main, service lines, hydrants, valves, and curb stops for the distribution water system along McKinely Circle in Marlborough, NH.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Install water/wastewater mains.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Install water/wastewater mains.
AvailablePremium
Access the largest public sector contact database
The City of Philadelphia (Water Department) is soliciting prequalification submissions for contractors to perform construction of green stormwater infrastructure and relay of water mains on Bristol Street and related locations. This is a pre-qualification (PQ) notice; approved sellers will be invited to a later closed bid solicitation. The estimated project cost is $4,000,000–$5,000,000 with a project duration of 275 days and includes workforce diversity goals and a bid bond requirement.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
The City of Philadelphia (Water Department) is soliciting prequalification submissions for contractors to perform construction of green stormwater infrastructure and relay of water mains on Bristol Street and related locations. This is a pre-qualification (PQ) notice; approved sellers will be invited to a later closed bid solicitation. The estimated project cost is $4,000,000–$5,000,000 with a project duration of 275 days and includes workforce diversity goals and a bid bond requirement.
Availableprovide Construction Inspection Services for distribution system improvement work in Calendar Year 2026. The required oversight for this project includes pre-bid services to get familiar with project, administer weekly construction meetings, inspection, specific construction administration tasks, and sampling/testing of construction materials. The consultant hired to perform these services should be qualified to perform a variety of inspection, record keeping and construction engineering activities as outlined in this RFQ. The construction activities requiring Construction Inspection Services includes, but is not limited to, the following: Replacement of approximately 2,500 feet of water main, paving, surface restoration, approved traffic control measures and all necessary work.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
provide Construction Inspection Services for distribution system improvement work in Calendar Year 2026. The required oversight for this project includes pre-bid services to get familiar with project, administer weekly construction meetings, inspection, specific construction administration tasks, and sampling/testing of construction materials. The consultant hired to perform these services should be qualified to perform a variety of inspection, record keeping and construction engineering activities as outlined in this RFQ. The construction activities requiring Construction Inspection Services includes, but is not limited to, the following: Replacement of approximately 2,500 feet of water main, paving, surface restoration, approved traffic control measures and all necessary work.
AvailableReplace domestic water/fire mains and main backflow devices, for architectural and engineering design services. The consultant shall provide all necessary architectural and engineering (a/e) services as required to prepare complete contract drawings, specifications, technical reports, cost estimates, and services throughout construction for "replace domestic water/fire mains and main backflow devices
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Replace domestic water/fire mains and main backflow devices, for architectural and engineering design services. The consultant shall provide all necessary architectural and engineering (a/e) services as required to prepare complete contract drawings, specifications, technical reports, cost estimates, and services throughout construction for "replace domestic water/fire mains and main backflow devices
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis