Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Philadelphia (Water Department) is soliciting prequalification submissions for contractors to perform construction of green stormwater infrastructure and relay of water mains on Bristol Street and related locations. This is a pre-qualification (PQ) notice; approved sellers will be invited to a later closed bid solicitation. The estimated project cost is $4,000,000–$5,000,000 with a project duration of 275 days and includes workforce diversity goals and a bid bond requirement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of green stormwater infrastructure and relay of water mains. Including 12 LF Saw Cutting - Roadway; 6 LF Saw cutting - Footway; 30 LF PennDOT Pipe Foundation Underdrain; 75 LF of 4" Ductile Iron Pipe; 90 LF of 6" Ductile Iron Pipe; 110 LF of 8" Ductile Iron Pipe; 145 LF of 12" Ductile Iron Pipe; 2,350 ea of 4" Ductile Iron Gate Valve; 3,000 ea of 6" Ductile Iron Gate Valve; 28 LF of 3" K Copper service relay Including making connections, jetting and boring, excavation, backfilling; 33 LF of 1" K Copper service relay Including making connections, jetting and boring, excavation, backfilling; 47 LF of 1.5" K Copper service relay Including making connections, jetting and boring, excavation, backfilling; 61 LF of 2" K Copper service relay Including making connections, jetting and boring, excavation, backfilling. See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Premium
Access the largest public sector contact database
Close: Jan 22, 2026
Construction of green stormwater infrastructure and relay of water mains. Including 12 LF Saw Cutting - Roadway; 6 LF Saw cutting - Footway; 30 LF PennDOT Pipe Foundation Underdrain; 75 LF of 4" Ductile Iron Pipe; 90 LF of 6" Ductile Iron Pipe; 110 LF of 8" Ductile Iron Pipe; 145 LF of 12" Ductile Iron Pipe; 2,350 ea of 4" Ductile Iron Gate Valve; 3,000 ea of 6" Ductile Iron Gate Valve; 28 LF of 3" K Copper service relay Including making connections, jetting and boring, excavation, backfilling; 33 LF of 1" K Copper service relay Including making connections, jetting and boring, excavation, backfilling; 47 LF of 1.5" K Copper service relay Including making connections, jetting and boring, excavation, backfilling; 61 LF of 2" K Copper service relay Including making connections, jetting and boring, excavation, backfilling. See attached file.
AvailableContract includes all work necessary to produce complete and fully usable water, sewer, and green stormwater infrastructure facilities. In general, the work includes sawcutting and removal of existing sidewalk and paving; excavation of trenches and disposal of material; excavation and grading of rain gardens, stormwater bumpouts and swales; installation of check dams and spillways; installation of clean washed stone and geotextile; installation of thermoplastic, ductile iron and RCP drainage pipe and fittings, cleanouts and riser structures; installation of energy dissipaters; installation of observation wells; installation of trench drains and concrete aprons; installation of new stormwater inlets, control structures and laterals; installation and modification of existing inlets, restoration of sidewalks, curbs, streets and disturbed residential lawns;, and placement and grading of specified stormwater and planting soils.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Contract includes all work necessary to produce complete and fully usable water, sewer, and green stormwater infrastructure facilities. In general, the work includes sawcutting and removal of existing sidewalk and paving; excavation of trenches and disposal of material; excavation and grading of rain gardens, stormwater bumpouts and swales; installation of check dams and spillways; installation of clean washed stone and geotextile; installation of thermoplastic, ductile iron and RCP drainage pipe and fittings, cleanouts and riser structures; installation of energy dissipaters; installation of observation wells; installation of trench drains and concrete aprons; installation of new stormwater inlets, control structures and laterals; installation and modification of existing inlets, restoration of sidewalks, curbs, streets and disturbed residential lawns;, and placement and grading of specified stormwater and planting soils.
AvailableThe City of Philadelphia seeks prequalification for contractors for relay of water mains on Levick Street and construction of green stormwater infrastructure on Harbison Avenue. The solicitation is a prequalification (PQ) for bidding on a public works project with an estimated cost between $3,000,000 and $4,000,000 and will require compliance with local business, workforce diversity, and prevailing wage regulations. Prequalification questionnaires and specification/plan attachments are posted on the City procurement site; prequalification submissions are due by the listed closing date.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
The City of Philadelphia seeks prequalification for contractors for relay of water mains on Levick Street and construction of green stormwater infrastructure on Harbison Avenue. The solicitation is a prequalification (PQ) for bidding on a public works project with an estimated cost between $3,000,000 and $4,000,000 and will require compliance with local business, workforce diversity, and prevailing wage regulations. Prequalification questionnaires and specification/plan attachments are posted on the City procurement site; prequalification submissions are due by the listed closing date.
AvailableSewer reconstruction and relay of water mains and construction of green stormwater infrastructure. Includes 25 LF of 24" RCP Sewer; 295 LF of 30" RCP Sewer; 5 LF of 12" Vent Connections; 55 LF of 15" Inlet connections; 3 ea Sewer Manholes for Pipes 30" and Under; 250 SY of Plain Cement Concrete Base Course, 8" Depth, (Including Subgrading); 235 LF Superpave Wearing Course, 64-22 PG, 1-1/2" depth, Type A; 50 SY Superpave 64-22 PG, Type A, ( 1-1/2 inch Binder Course and 1-1/2" Wearing Course); 445 LF of 6" DI Pipe; 1,910 LF of 8" DI pipe; 225 LF of 3/4" copper service pipe from water main to curb stop; 30 LF of 1" copper service pipe from water main to curb stop; 30 LF of 3/4" copper supply pipe from curb stop to meter; 300 SY Superpave Wearing Course, 64-22 PG, 1-1/2" depth, Type A. See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Sewer reconstruction and relay of water mains and construction of green stormwater infrastructure. Includes 25 LF of 24" RCP Sewer; 295 LF of 30" RCP Sewer; 5 LF of 12" Vent Connections; 55 LF of 15" Inlet connections; 3 ea Sewer Manholes for Pipes 30" and Under; 250 SY of Plain Cement Concrete Base Course, 8" Depth, (Including Subgrading); 235 LF Superpave Wearing Course, 64-22 PG, 1-1/2" depth, Type A; 50 SY Superpave 64-22 PG, Type A, ( 1-1/2 inch Binder Course and 1-1/2" Wearing Course); 445 LF of 6" DI Pipe; 1,910 LF of 8" DI pipe; 225 LF of 3/4" copper service pipe from water main to curb stop; 30 LF of 1" copper service pipe from water main to curb stop; 30 LF of 3/4" copper supply pipe from curb stop to meter; 300 SY Superpave Wearing Course, 64-22 PG, 1-1/2" depth, Type A. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis