MARE ISLAND FACILITIES MAJOR MAINTENANCE NAVAL CHAPEL AND ADMIRAL’S MANSION/QUARTERS A IMPROVEMENT
Description: The work generally consists of, but is not limited to: Naval Chapel HUD Grant Base Scope: Envelope Upgrades • Wall shingle repair / replacement • Wood trim repair / replacement • Front & side wood stair repair • Prep /paint exterior (building permit not required for repainting) • Gutter / rainwater leader repair incl. leaf guards • Confirm walkway from street meets slope & cross-slope criteria Quarters A NPS Grant Base Scope: • Rated sheetrock at basement ceiling • Crawlspace access openings • Patch / match / paint disrupted plaster • Wheelchair lift and landing • Handrails at front porch • Accessible restroom upgrades • Handrails at all stairs • Sleepered raised floor at glassed-in porch Required accessible signage • Foundation repairs, re-point int. basement masonry • Sill bolting throughout at foundation to first-floor floor framing • Shear transfer clips at framing to sills at foundation • Blocking at first-floor joist bays at support girders • Vertical load upgrades, bolt c-channels to wood girders in basement • Wooden post base and cap connections at basement • Shear walls / foundation at basement line 4.5- coord. with possible first floor shear walls above • Masonry chimney bracing at floor lines, and above roof • Electrical circuit for wheelchair lift • Misc. electrical / plumbing upgrades as required when uncovered by seismic work • Adjust plumbing or furr around at basement ceiling to install sheetrock ceiling • Cap plumbing to unused bathrooms Quarters A HUD Grant Base Scope: • Prep /paint exterior, repair wood elements as required • Re-point exterior masonry chimneys at roof as required • Replace existing composition shingle roofing & repair existing sheet metal roofing • Strip and recoat existing sheet metal roofing • Gutter / rainwater leader repair See the attached Plans, Specifications, and Addendum Nos. 1-5.
- Buyer
- City of Vallejo
City · CA, US
- Released
- Oct 19, 2026
- Closes
- Nov 3, 2026(6 days left)
