Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Manhole rehabilitation including manhole rehabilitations and replacements, sewer line replacements, and other miscellaneous items of construction required to complete the work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Rehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe and manhole rehabilitation.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Rehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe and manhole rehabilitation.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes rehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe, including smoke testing, televising and cleaning, mechanical root removal, joint seals, exploratory excavations and point repairs of main lines and laterals, manhole rehabilitation shall include realignment, leak inspection, chimney replacement or seal installation, bench and invert repair, manhole raising, frame and cover replacement, inflow protector installation and interior manhole coating/lining.
Posted Date
Aug 17, 2025
Due Date
Feb 4, 2026
Release: Aug 17, 2025
Close: Feb 4, 2026
Work includes rehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe, including smoke testing, televising and cleaning, mechanical root removal, joint seals, exploratory excavations and point repairs of main lines and laterals, manhole rehabilitation shall include realignment, leak inspection, chimney replacement or seal installation, bench and invert repair, manhole raising, frame and cover replacement, inflow protector installation and interior manhole coating/lining.
AvailablePerform on-call ultra-violet cured-in-place pipe (UV-CIPP) lining as well as contractors to perform manhole rehabilitation via the application of 100% solids epoxy coating.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Perform on-call ultra-violet cured-in-place pipe (UV-CIPP) lining as well as contractors to perform manhole rehabilitation via the application of 100% solids epoxy coating.
AvailableRehabilitation on various manholes on an as needed basis.
Posted Date
Dec 26, 2025
Due Date
Jan 20, 2026
Release: Dec 26, 2025
Close: Jan 20, 2026
Rehabilitation on various manholes on an as needed basis.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →