Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Borough of Pottstown is seeking bids to replace the outdoor carpet surfaces at the Manatawny Green Miniature Golf course. The project is funded through a grant from the Pottstown Regional Park Improvements Mini Grants Program and is issued as an IFB. The solicitation was posted on Dec. 16, 2025 with a response deadline of Jan. 13, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
In general, the project consists of removing the existing outdoor carpet surfaces and existing adhesives, substrate preparation and installation of the new outdoor carpet surfaces.
Posted Date
Sep 15, 2025
Due Date
Jan 13, 2026
Release: Sep 15, 2025
Close: Jan 13, 2026
In general, the project consists of removing the existing outdoor carpet surfaces and existing adhesives, substrate preparation and installation of the new outdoor carpet surfaces.
AvailableTrack surface replacement. Removal of existing track and jumping event 1 rubberized surface and finish lift of asphalt for the track, d areas, and long/triple jump runways, 2 reconstruction of the pole vault runway and landing areas in concrete, new rubberized track surfacing for 3 all track running and jumping events, and site restoration of all disturbed areas during construction.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Close: Jan 8, 2026
Track surface replacement. Removal of existing track and jumping event 1 rubberized surface and finish lift of asphalt for the track, d areas, and long/triple jump runways, 2 reconstruction of the pole vault runway and landing areas in concrete, new rubberized track surfacing for 3 all track running and jumping events, and site restoration of all disturbed areas during construction.
AvailableBridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
AvailableBridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →