Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Track surface replacement. Removal of existing track and jumping event 1 rubberized surface and finish lift of asphalt for the track, d areas, and long/triple jump runways, 2 reconstruction of the pole vault runway and landing areas in concrete, new rubberized track surfacing for 3 all track running and jumping events, and site restoration of all disturbed areas during construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Professional and qualified vendors to provide resurfacing of track and turf at French Field and the redesign and construction of the long-jump and the discus areas.
Posted Date
Nov 18, 2025
Due Date
Jan 5, 2026
Release: Nov 18, 2025
Close: Jan 5, 2026
Professional and qualified vendors to provide resurfacing of track and turf at French Field and the redesign and construction of the long-jump and the discus areas.
AvailablePremium
Access the largest public sector contact database
Work includes installation of porous pavement, 4" asphalt pavement over 8" dense graded base course, curb and gutter replacement, miscellaneous concrete sidewalk, concrete driveway approaches, storm sewer and storm catch basin and manhole replacement, light poles, electrical conduit, landscaping, playground equipment installations, rain garden installations and all incidental items necessary to complete the work.
Posted Date
Mar 26, 2025
Due Date
Dec 17, 2025
Release: Mar 26, 2025
Close: Dec 17, 2025
Work includes installation of porous pavement, 4" asphalt pavement over 8" dense graded base course, curb and gutter replacement, miscellaneous concrete sidewalk, concrete driveway approaches, storm sewer and storm catch basin and manhole replacement, light poles, electrical conduit, landscaping, playground equipment installations, rain garden installations and all incidental items necessary to complete the work.
AvailableProvide general contracting services for construction of the high school track and field replacement project. Project includes the demolition and replacement of the existing synthetic track and artificial turf field. New work also includes a retaining wall with drainage, new AC paving with an aggregate base, slurry coat and seal of existing AC paving. demolition and removal of the existing CMU backstop & adjacent fencing, as well as portions of existing chain link perimeter fencing.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Provide general contracting services for construction of the high school track and field replacement project. Project includes the demolition and replacement of the existing synthetic track and artificial turf field. New work also includes a retaining wall with drainage, new AC paving with an aggregate base, slurry coat and seal of existing AC paving. demolition and removal of the existing CMU backstop & adjacent fencing, as well as portions of existing chain link perimeter fencing.
AvailableThe Southeastern Pennsylvania Transportation Authority (SEPTA) is soliciting proposals for the replacement of the existing CBTC Signal System currently in service. This pre-proposal opportunity, identified as RFP No.: 22-00172-AJEB, focuses on the Subway Surface Tunnel Signal System. The project aims to modernize the CBTC systems along the Route 34 Trolley Tunnel between 13th Street and 40th Street stations.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
The Southeastern Pennsylvania Transportation Authority (SEPTA) is soliciting proposals for the replacement of the existing CBTC Signal System currently in service. This pre-proposal opportunity, identified as RFP No.: 22-00172-AJEB, focuses on the Subway Surface Tunnel Signal System. The project aims to modernize the CBTC systems along the Route 34 Trolley Tunnel between 13th Street and 40th Street stations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis