Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Borough of Pottstown
Paving Work will be performed at various locations in the Borough for Street Overlay of approx. 3000 Tons. Work will include supplying and installing Asphalt Mixture Design 9.5 mm, WC PG 64S-22, .3-30 M ESAL’S, SRL-H, sealant. Item 2 of base bid; Milling, approx. 26,000 SY of milling. Item 3 of base bid; Base replacement, replacement as needed. 1. Paving and 2. Milling.
Posted Date
Jul 19, 2026
Due Date
Jul 31, 2026
Release: Jul 19, 2026
Borough of Pottstown
Close: Jul 31, 2026
Paving Work will be performed at various locations in the Borough for Street Overlay of approx. 3000 Tons. Work will include supplying and installing Asphalt Mixture Design 9.5 mm, WC PG 64S-22, .3-30 M ESAL’S, SRL-H, sealant. Item 2 of base bid; Milling, approx. 26,000 SY of milling. Item 3 of base bid; Base replacement, replacement as needed. 1. Paving and 2. Milling.
AvailableBorough of Pottstown
Work inlcudes high priority arch repairs. Borough of Pottstown is performing arch repairs on eight (8) different segments of stormwater arches ranging in length throughout the Borough of Pottstown. The work includes rehabilitating the stormwater arches by repairing the concrete benching, performing concrete patching, and installing gunite lining. The scope of construction items also include temporary soil erosion and sediment controls and bypass pumping as required to complete the work.
Posted Date
May 11, 2026
Due Date
Jun 2, 2026
Release: May 11, 2026
Borough of Pottstown
Close: Jun 2, 2026
Work inlcudes high priority arch repairs. Borough of Pottstown is performing arch repairs on eight (8) different segments of stormwater arches ranging in length throughout the Borough of Pottstown. The work includes rehabilitating the stormwater arches by repairing the concrete benching, performing concrete patching, and installing gunite lining. The scope of construction items also include temporary soil erosion and sediment controls and bypass pumping as required to complete the work.
Borough of Pottstown
Lead service verification of approx.202 water service lines (via test pits), replacement of approx. 1,458 LF of lead service lines (within the Public Right-of-Way), replacement of approximately 81 water service curb stops, installation of approx. 1,458 LF of 3/4" copper service lines; associated restoration and demolition work; and all other work.
Posted Date
Apr 17, 2026
Due Date
May 14, 2026
Release: Apr 17, 2026
Borough of Pottstown
Close: May 14, 2026
Lead service verification of approx.202 water service lines (via test pits), replacement of approx. 1,458 LF of lead service lines (within the Public Right-of-Way), replacement of approximately 81 water service curb stops, installation of approx. 1,458 LF of 3/4" copper service lines; associated restoration and demolition work; and all other work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Sole Source: Not viable based on past practice—deprioritize and redirect to bids and coop education.
Coops: Frequently procures through COSTARS, DGS statewide contracts, PEPPM, and Sourcewell; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Borough of Pottstown: No sole source awards evident in public records; this path is not viable.
Dollar thresholds: None specified in available information.
Board meetings and strategic plans from Borough of Pottstown
The meeting featured a presentation on the Coolidge Commons project, with discussions regarding water and sewer progress, sidewalk installation, access to Wilson Street, safety concerns, and the need for a revised traffic study. The commission also addressed blight procedures following a bus tour, reviewed the withdrawal of Douglass Township from the Pottstown Regional Planning Commission, noted progress on the Keim Street Bridge contract, and discussed the upcoming final inspection for the Schuylkill Trail.
The meeting involved the consideration of various administrative and legislative matters. Key topics included the adoption of amendments to the 2026 fee schedule, the Borough Council's meeting rules, and the residential rental ordinance. The Council awarded bids for a police vehicle and the Goose and Tanyard Run repair project. Financial actions included the approval of the Pottstown Area Rapid Transit (PART) operating budget and local match resolution, as well as the payment of bills. Additionally, the Council addressed land development applications, including the denial and approval of specific waivers for a property at 658 Jefferson Avenue, and approved requests for event-related street closures and alcohol consumption.
The meeting included a review of the financial report and the approval of payments for professional legal services, policy revision work, audit services, and administrative fees. The Administrator provided an update on property acquisition efforts for upcoming tax sales and coordination with the Borough regarding tax status compliance. Discussion occurred regarding status updates for the 421 Hale property and the 633 Walnut project with Habitat for Humanity. The Board authorized the solicitor to share proposed policy and procedure revisions with the Borough solicitor and discussed recent Housing Coalition activities and a blighted property tour.
The council meeting addressed a variety of administrative and operational items. Key discussion topics included an amendment to the 2026 fee schedule for tax certifications, updates to the Council's Meeting Rules of Order, and the award of a bid for a police vehicle and a repair project for the Goose and Tanyard Run. Additionally, the council reviewed the Pottstown Area Rapid Transit operating budget for fiscal year 2026-2027 and associated local match resolutions. Further actions included the approval of an alcohol consumption request for the Ride for the River event, a street closure for the Big Boy Locomotive Viewing Event, and several Certificates of Appropriateness for historical properties. New business items involved a proposed amendment to the residential rental ordinance and potential land development actions regarding 658 Jefferson Avenue.
The agenda includes a police presentation for the 2025 Police Officer of the Year, various subcommittee and board reports, and a presentation by the Daughters of the American Revolution. Key agenda items cover land development and zoning applications, bid approvals for police vehicles and infrastructure repairs, and the review of the Pottstown Area Rapid Transit budget and financial assistance resolution. The committee will also address requests for alcohol consumption and street closures, discuss upcoming board vacancies, and review potential amendments to the fee schedule and rental ordinances.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Borough of Pottstown's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge