Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing all labor, materials, tools, traffic control, and equipment necessary for the maintenance of landscaped areas, including weeding, mowing, trimming, care of trees and shrubs, edging, and invasive plant removal, along the State Right-of-Way on an open end/"as-needed" basis.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP, H3(ABC)-01-26C, is an open solicitation from the Hawaii Department of Transportation for the maintenance of landscaped areas along the H-3 Freeway. The work involves various landscaping tasks from Halawa Quarry to Harano Tunnel in the District of Ewa on Oahu. Bids are due by February 23, 2026, at 2:00 PM Hawaii Standard Time.
Posted Date
Jan 16, 2026
Due Date
Feb 24, 2026
Release: Jan 16, 2026
Close: Feb 24, 2026
This RFP, H3(ABC)-01-26C, is an open solicitation from the Hawaii Department of Transportation for the maintenance of landscaped areas along the H-3 Freeway. The work involves various landscaping tasks from Halawa Quarry to Harano Tunnel in the District of Ewa on Oahu. Bids are due by February 23, 2026, at 2:00 PM Hawaii Standard Time.
AvailableWork includes installation of new traffic signal systems, including new service connections; installation and maintenance of best management practices; road restoration and repairs, included sidewalk/curb ramp reconstruction and resurfacing within established rights-of-way; utility relocation as required; signing and pavement markings; and traffic control.
Posted Date
Jan 6, 2026
Due Date
Feb 17, 2026
Release: Jan 6, 2026
Close: Feb 17, 2026
Work includes installation of new traffic signal systems, including new service connections; installation and maintenance of best management practices; road restoration and repairs, included sidewalk/curb ramp reconstruction and resurfacing within established rights-of-way; utility relocation as required; signing and pavement markings; and traffic control.
AvailableThe City of Campbell is soliciting proposals for professional engineering design and environmental services to widen the Highway 17 southbound off-ramp at Hamilton Avenue to increase turning capacity and improve traffic flow. The scope includes design to reconfigure lanes, coordination with Caltrans, VTA, local advisory committees, and utilities, and compliance with Caltrans standards. The solicitation was posted in mid-January 2026 and has a response deadline in February 2026.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
The City of Campbell is soliciting proposals for professional engineering design and environmental services to widen the Highway 17 southbound off-ramp at Hamilton Avenue to increase turning capacity and improve traffic flow. The scope includes design to reconfigure lanes, coordination with Caltrans, VTA, local advisory committees, and utilities, and compliance with Caltrans standards. The solicitation was posted in mid-January 2026 and has a response deadline in February 2026.
AvailableThe scope of work consists of adding a second left-turn lane, installing a new traffic signal system and additional highway lighting, and modifying U-turns, including excavation, cold-planing, grading, trenching, drainage structure modifications, utility relocations, curb and curb ramp reconstruction, paving, striping, signing, traffic control, hydromulching, and installation and monitoring of temporary best management practices.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
The scope of work consists of adding a second left-turn lane, installing a new traffic signal system and additional highway lighting, and modifying U-turns, including excavation, cold-planing, grading, trenching, drainage structure modifications, utility relocations, curb and curb ramp reconstruction, paving, striping, signing, traffic control, hydromulching, and installation and monitoring of temporary best management practices.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis