Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of St. Charles, Illinois is soliciting bids for the Main Wastewater Treatment Facility UV Rehabilitation project. The work includes removal of existing UV disinfection equipment and NPW filters and construction of a new cast‑in‑place concrete and masonry structure to house new UV equipment and filters, with associated improvements. Bids are submitted electronically via DemandStar, with a pre‑bid meeting scheduled for January 6, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of the removal and replacement of clarifier effluent weirs, launder troughs, weir support arms, column, scraper, and other related appurtenances.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Work consists of the removal and replacement of clarifier effluent weirs, launder troughs, weir support arms, column, scraper, and other related appurtenances.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD. Provide integrated design and construction services of new facilities related to sidestream treatment and ultraviolet (UV) disinfection project.project consists of two main components, ultraviolet (UV) disinfection facility improvements and a new sidestream treatment facility. The UV improvements generally consist of constructing a new UV facility to replace the current facility, installing new influent and effluent piping, altering the effluent pump station and existing UV facility, revisions to the flow meter vault and influent piping, and electrical and instrumentation equipment. The sidestream treatment facility generally consists of intercepting and diverting centrate flows from the existing centrifuges, constructing new equalization (EQ) basins and reactors, a blower and electrical/control building, and modifications to the electrical feed.
Posted Date
Oct 23, 2025
Due Date
Jan 22, 2026
Release: Oct 23, 2025
Close: Jan 22, 2026
DESIGN-BUILD. Provide integrated design and construction services of new facilities related to sidestream treatment and ultraviolet (UV) disinfection project.project consists of two main components, ultraviolet (UV) disinfection facility improvements and a new sidestream treatment facility. The UV improvements generally consist of constructing a new UV facility to replace the current facility, installing new influent and effluent piping, altering the effluent pump station and existing UV facility, revisions to the flow meter vault and influent piping, and electrical and instrumentation equipment. The sidestream treatment facility generally consists of intercepting and diverting centrate flows from the existing centrifuges, constructing new equalization (EQ) basins and reactors, a blower and electrical/control building, and modifications to the electrical feed.
AvailableThe project consists of the rehabilitation of a portion of the liverpool force main. The 18-inch pccp liverpool force main is to be rehabilitated using a flexible fabric reinforced pipe. The project also includes the replacement of valve vaults and access and air valve manholes.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The project consists of the rehabilitation of a portion of the liverpool force main. The 18-inch pccp liverpool force main is to be rehabilitated using a flexible fabric reinforced pipe. The project also includes the replacement of valve vaults and access and air valve manholes.
AvailableThe City of Manteca is seeking Progressive Design-Build Services for the integrated design and construction of new facilities related to sidestream treatment and ultraviolet (UV) disinfection.
Posted Date
Oct 23, 2025
Due Date
Jan 22, 2026
Release: Oct 23, 2025
Close: Jan 22, 2026
The City of Manteca is seeking Progressive Design-Build Services for the integrated design and construction of new facilities related to sidestream treatment and ultraviolet (UV) disinfection.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →