Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the rehabilitation of a portion of the liverpool force main. The 18-inch pccp liverpool force main is to be rehabilitated using a flexible fabric reinforced pipe. The project also includes the replacement of valve vaults and access and air valve manholes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes to furnish and install approx. 1,400 LF of 6" force main including connections to existing lift station and existing manhole.
Posted Date
Dec 3, 2025
Due Date
Dec 16, 2025
Release: Dec 3, 2025
Close: Dec 16, 2025
Work includes to furnish and install approx. 1,400 LF of 6" force main including connections to existing lift station and existing manhole.
AvailablePremium
Access the largest public sector contact database
Work of this project consists of the installation of a new force main and replacement/rehabilitation of existing gravity sewer, that will eventually connect into the newly constructed pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Close: Jan 6, 2026
Work of this project consists of the installation of a new force main and replacement/rehabilitation of existing gravity sewer, that will eventually connect into the newly constructed pump station.
AvailableWork includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
AvailableRelease: Dec 5, 2025
Close: Jan 8, 2026
Sewer main rehabilitation project.