Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Cincinnati, through Greater Cincinnati Water Works, is seeking a consultant for the design and construction administration of recoating and improvements to the historic Main Station Standpipe. The project includes NACE-certified paint inspection and phased services to ensure water quality and system integrity are maintained throughout the process. A mandatory pre-bid meeting is scheduled for February 10, 2026, with final proposals due by February 24, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Roseville is soliciting proposals for a design-assist and construction contract to replace approximately 400 feet of 24-inch water transmission main on Cirby Way, including installation of 8-inch lateral connections and related appurtenances (valves, blow-offs, cathodic protection, and test stations). The selected contractor will collaborate with the Citys Engineering Design Consultant during final design and provide all labor, materials, equipment, and appurtenances per the Contract Documents. The solicitation estimates a project value between $1,000,000 and $3,000,000 and is open for proposals.
Posted Date
Jan 8, 2026
Due Date
Mar 9, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Mar 9, 2026
The City of Roseville is soliciting proposals for a design-assist and construction contract to replace approximately 400 feet of 24-inch water transmission main on Cirby Way, including installation of 8-inch lateral connections and related appurtenances (valves, blow-offs, cathodic protection, and test stations). The selected contractor will collaborate with the Citys Engineering Design Consultant during final design and provide all labor, materials, equipment, and appurtenances per the Contract Documents. The solicitation estimates a project value between $1,000,000 and $3,000,000 and is open for proposals.
Availablework consists of: upgrading the standpipe system in Van Hise Hall to provide a reliable system in compliance with current fire codes. Upgrades include the following: a new split, high-low level standpipe system with interconnected sprinkler system tamper switches and flow alarms; primary drain riser to serve all floors; and elimination of over pressurized, leaking hose valves.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
work consists of: upgrading the standpipe system in Van Hise Hall to provide a reliable system in compliance with current fire codes. Upgrades include the following: a new split, high-low level standpipe system with interconnected sprinkler system tamper switches and flow alarms; primary drain riser to serve all floors; and elimination of over pressurized, leaking hose valves.
AvailableProvide ground storage tank recoating.
Posted Date
Jan 13, 2026
Due Date
Feb 27, 2026
Release: Jan 13, 2026
Close: Feb 27, 2026
Provide ground storage tank recoating.
AvailableProcurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.