Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
work consists of: upgrading the standpipe system in Van Hise Hall to provide a reliable system in compliance with current fire codes. Upgrades include the following: a new split, high-low level standpipe system with interconnected sprinkler system tamper switches and flow alarms; primary drain riser to serve all floors; and elimination of over pressurized, leaking hose valves.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The School District of Lee County Procurement Services (Construction Procurement) issued RFQ CQ26-0158AN to obtain qualifications from firms to provide mechanical, electrical, and plumbing (MEP) engineering services for the HVAC renovation at Mariner High School in Cape Coral, FL. The work includes mechanical, electrical, structural, minor architectural, and plumbing engineering services; the RFQ references a detailed Scope of Work (page 20) and a target project total cost between $8 million and $12 million. Responses are submitted electronically via the district’s Bonfire portal; questions are due Feb 4, 2026 and proposals are due Feb 18, 2026 at 1:00 PM EST.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
The School District of Lee County Procurement Services (Construction Procurement) issued RFQ CQ26-0158AN to obtain qualifications from firms to provide mechanical, electrical, and plumbing (MEP) engineering services for the HVAC renovation at Mariner High School in Cape Coral, FL. The work includes mechanical, electrical, structural, minor architectural, and plumbing engineering services; the RFQ references a detailed Scope of Work (page 20) and a target project total cost between $8 million and $12 million. Responses are submitted electronically via the district’s Bonfire portal; questions are due Feb 4, 2026 and proposals are due Feb 18, 2026 at 1:00 PM EST.
AvailableThe School Board of Lee County is issuing a Request for Qualifications (RFQ No. CQ26-0161LN) for Mechanical, Electrical and Plumbing (MEP) Services specifically for the HVAC Renovation project at Estero High School. The electronic submission deadline is set for 1:00 PM EST on February 18, 2026. A mandatory pre-submission meeting and site walkthrough is scheduled for January 30, 2026, and questions are due by February 4, 2026.
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
The School Board of Lee County is issuing a Request for Qualifications (RFQ No. CQ26-0161LN) for Mechanical, Electrical and Plumbing (MEP) Services specifically for the HVAC Renovation project at Estero High School. The electronic submission deadline is set for 1:00 PM EST on February 18, 2026. A mandatory pre-submission meeting and site walkthrough is scheduled for January 30, 2026, and questions are due by February 4, 2026.
Provide a turnkey solution as well as upgrades for the renovation of the mechanical, electrical, and plumbing systems. demolition and replacement of existing MEP equipment and piping as documented at each campus.
Posted Date
Dec 21, 2025
Due Date
Feb 5, 2026
Release: Dec 21, 2025
Close: Feb 5, 2026
Provide a turnkey solution as well as upgrades for the renovation of the mechanical, electrical, and plumbing systems. demolition and replacement of existing MEP equipment and piping as documented at each campus.
AvailableThe Village of Park Forest seeks sealed bids for repainting and maintenance of the 3,000,000‑gallon Tamarack standpipe, including surface preparation, debris collection/disposal, and painting. The work includes installing a mixing system and other miscellaneous items. The project is funded in part by an IEPA loan and is subject to Davis‑Bacon, DBE, and other applicable regulations.
Posted Date
Dec 22, 2025
Due Date
Feb 17, 2026
Release: Dec 22, 2025
Close: Feb 17, 2026
The Village of Park Forest seeks sealed bids for repainting and maintenance of the 3,000,000‑gallon Tamarack standpipe, including surface preparation, debris collection/disposal, and painting. The work includes installing a mixing system and other miscellaneous items. The project is funded in part by an IEPA loan and is subject to Davis‑Bacon, DBE, and other applicable regulations.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis