CityAZ
Posted
Aug 28, 2026
Oct 1, 2026
Citywide Water Main Replacement Phase 2
Work includes 4,694 SY remove and dispose of existing asphalt pavement; 112 LF remove and dispose of existing vertical curb and gutter; 235 SF remove and dispose of existing concrete channel; 16 LF remove and dispose of existing guardrail; 10 LF remove and reset existing fence; 30 LF remove existing water main acp friable; 70 LF remove existing water main acp non-friable; 3,456 LF abandon existing water main; 35 EA remove exisintg water service connection. See attached file.