Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the removal and replacement of the existing mechanical screen and associated electrical and mechanical appurtenances at the city's main sewage lift station.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Qualification phase for suitable suppliers for the rehabilitation of DC water's historic main pump station outside of DC water's hqo location.
Posted Date
Nov 4, 2025
Due Date
Dec 15, 2025
Release: Nov 4, 2025
Close: Dec 15, 2025
Qualification phase for suitable suppliers for the rehabilitation of DC water's historic main pump station outside of DC water's hqo location.
AvailablePremium
Access the largest public sector contact database
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
AvailableThis is a qualification-phase RFQ from District of Columbia Water and Sewer Authority (DC Water) seeking qualified suppliers to rehabilitate the historic Main Sewage Pumping Station outside DC Water’s HQ, including assessments, design modifications, structural and equipment repairs, and compliance upgrades. The solicitation sets requirements such as DBE/WBE participation goals (10% for Phase 1), Davis-Bacon wage compliance, bonding and insurance, and phased deliverables. The estimated contract value range shown is roughly $5,000,000–$20,000,000 and the solicitation is posted on DC Water’s procurement portal.
Posted Date
Dec 9, 2025
Due Date
Dec 15, 2025
Release: Dec 9, 2025
Close: Dec 15, 2025
This is a qualification-phase RFQ from District of Columbia Water and Sewer Authority (DC Water) seeking qualified suppliers to rehabilitate the historic Main Sewage Pumping Station outside DC Water’s HQ, including assessments, design modifications, structural and equipment repairs, and compliance upgrades. The solicitation sets requirements such as DBE/WBE participation goals (10% for Phase 1), Davis-Bacon wage compliance, bonding and insurance, and phased deliverables. The estimated contract value range shown is roughly $5,000,000–$20,000,000 and the solicitation is posted on DC Water’s procurement portal.
AvailableThe City of Sunrise is soliciting a design-build firm to provide final design, permitting, and construction services for Lift Station Basin 122 Improvement (including Lift Stations 119, 120, 122 and 156). This Step 2 RFP is limited to firms that were pre-qualified in Step 1 (City approval of qualified firms completed Sept 15, 2025). The procurement is for construction/design-build services (not a grant) and is being distributed by DemandStar with addenda posted as needed.
Posted Date
Oct 20, 2025
Due Date
Jan 8, 2026
Release: Oct 20, 2025
Close: Jan 8, 2026
The City of Sunrise is soliciting a design-build firm to provide final design, permitting, and construction services for Lift Station Basin 122 Improvement (including Lift Stations 119, 120, 122 and 156). This Step 2 RFP is limited to firms that were pre-qualified in Step 1 (City approval of qualified firms completed Sept 15, 2025). The procurement is for construction/design-build services (not a grant) and is being distributed by DemandStar with addenda posted as needed.