CityID
Posted
Sep 1, 2026
Oct 2, 2026
Centennial-Rainey Levee Setback and Ecosystem Enhancement
Work includes approx 2,150 SF of boardwalk; 405 LF of Removal Abandoned Waterline; 15 LF of Remove Existing Water Service Line; 15 LF of Water Service Line, size to match existing; 3,122 LF of 6" standard Vertical Curb and Gutter; 1,282 SY of 4" concrete sidewalk; 606 LF of 12" Storm Drain PVC; 537 LF of 8" Gravity Sewer Pipe (w/ excavation, bedding, backfill); 120 LF of 3" standard Rolled Curb & Gutter; 1,260 LF of 6" standard Vertical Curb & Gutter;