Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of existing conditions of floor slabs and supporting structural elements in the m30 parking deck, recommend repairs and maintenance with the intent of developing bid documents to effect repairs that will extend the useful life of the structure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes memorial hall renovations. Entryways; main floor (2,880 sq. ft.); stage, curtain, and landings; restrooms (stage, landings, and restrooms total approximately 1,728 sq. ft.).
Posted Date
Jan 14, 2026
Due Date
Feb 19, 2026
Release: Jan 14, 2026
Close: Feb 19, 2026
Work includes memorial hall renovations. Entryways; main floor (2,880 sq. ft.); stage, curtain, and landings; restrooms (stage, landings, and restrooms total approximately 1,728 sq. ft.).
AvailableProvide architectural and engineering services for the renovation of school stadium. Replacing the natural grass football field with a synthetic turf multi-use field. Replacing the existing 6-lane running track, around the field, with a new 8-lane track. Replacing all of the existing grandstands with new grandstands that have an ada accessible area. Construction of a new press box. New field lighting. Construction of a new public restroom and concession building. Construction of a new ticket booth. Installing a new scoreboard. Constructing a new natural grass practice field. Replacing the track & field event amenities. Construct a new parking lot adjacent to the field, primarily for ada accessibility. Construction of a new storage building.
Posted Date
Dec 15, 2025
Due Date
Jan 30, 2026
Release: Dec 15, 2025
Close: Jan 30, 2026
Provide architectural and engineering services for the renovation of school stadium. Replacing the natural grass football field with a synthetic turf multi-use field. Replacing the existing 6-lane running track, around the field, with a new 8-lane track. Replacing all of the existing grandstands with new grandstands that have an ada accessible area. Construction of a new press box. New field lighting. Construction of a new public restroom and concession building. Construction of a new ticket booth. Installing a new scoreboard. Constructing a new natural grass practice field. Replacing the track & field event amenities. Construct a new parking lot adjacent to the field, primarily for ada accessibility. Construction of a new storage building.
AvailableProvide construction services to maintain aging infrastructure at the existing facility as a new facility is planned and designed. This may require various cmr services (including estimates) for the hvac, electrical, plumbing, technology/it, structural, and other aging systems during the project.
Posted Date
Jan 10, 2026
Due Date
Feb 16, 2026
Release: Jan 10, 2026
Close: Feb 16, 2026
Provide construction services to maintain aging infrastructure at the existing facility as a new facility is planned and designed. This may require various cmr services (including estimates) for the hvac, electrical, plumbing, technology/it, structural, and other aging systems during the project.
AvailableThis Request for Qualifications is for Construction Manager at Risk (CMR) services for renovations and additions across multiple school facilities within the Atlantic Community School District.
Posted Date
Jan 7, 2026
Due Date
Jan 26, 2026
Release: Jan 7, 2026
Close: Jan 26, 2026
This Request for Qualifications is for Construction Manager at Risk (CMR) services for renovations and additions across multiple school facilities within the Atlantic Community School District.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis