CityOH
Posted
Sep 16, 2026
Oct 1, 2026
OPWC Valentine Valley Drive Bridge (Culvert) Replacement RFP
Work includes replacement of a deteriorated 4-sided box culvert.
Description: Work includes approx 17 CY rock excavation; 20 LF 18" class A culvert; 9 SY plain riprap; 50 LF 6" yellow pavement marking waterborne; 531 SF tybe B prismatic oper sign.
County · MI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOH
Posted
Sep 16, 2026
Oct 1, 2026
Work includes replacement of a deteriorated 4-sided box culvert.
CityNY
Posted
Aug 13, 2026
Sep 30, 2026
Project consists of replacement of an existing, damaged, culvert structure with a new 33' wide span, 7' tall, 3-sided pre-cast concrete bridge with an invert slab and adjoining wingwalls. Site work includes water main relocation, roadway and drainage improvements, and miscellaneous landscaping.
CityWI
Posted
Sep 9, 2026
Sep 23, 2026
Work inlcudes removal and replacement of an existing storm water culvert located on gravel pit road.
CityMA
Posted
Aug 19, 2026
Sep 18, 2026
COMMBUYS lists BD-27-1755-THA00-THA01-132482 for the Town of Hawley’s replacement of the culvert at King Corner Road. The record states that GZA Geoenvironmental Consulting designed the project, a mandatory pre-bid meeting is required, and MassDOT BRIDGE-CULVERTS prequalification is required for $1,990,988.50. It is a construction procurement rather than a grant, with bids opening on September 18, 2026 at 2:00 PM.