CountyHI
Aug 19, 2026
Closes
Oct 8, 2026
Culvert Repairs At Makena Alanui Drive RFP
The project involves the repair of 2 corrugated metal pipe culvert systems . It includes replacement of two 10 ft corrugated metal pipes with reinforced concrete box culvert. Slip-lining of three 66" corrugated metal pipes with 54" high density polyethylene (HDPE pipes)