Conservation Implementation Plan (Request for Proposal)
Provide qualified consulting firms to prepare an implementation plan for achieving the remaining conservation goals established in the 2017 comprehensive plan.
Description: General construction of wastewater treatment plant and collection system improvements consisting of 18” overflow pipe, 3.0 MGD grinder, auger and pump station, 12” force main and 4” drain line, replacement of 100 gpm lift station and 4” force main, emergency generator, and associated site work, electrical, instrumentation controls and other site improvements.
City · IN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyNC
Posted
-
Sep 18, 2026
Provide qualified consulting firms to prepare an implementation plan for achieving the remaining conservation goals established in the 2017 comprehensive plan.
CityIN
Posted
Sep 10, 2026
Oct 5, 2026
he work shall consist of construction of a new 20 MGD wet weather lift station, with a mechanical fine screen and washer-compactor for the screenings, a 20 MGD Storm King Swirl Concentrator with liquid sodium hypochlorite for disinfection and sodium bi-sulfate de-chlorination, related tank dewatering and solids treatment systems, flow monitoring and controls and a new non-potable process water storage and booster pump system, along with building modifications and additions to existing building.
CitySC
Posted
Sep 1, 2026
Oct 6, 2026
Project includes demo of existing restroom and playground elements. Construction of sitework and associated improvements for new restroom buildings, playground, existing swing relocation, restoration and refinishing of basketball court and all associated appurtenances as shown on drawings and in accordance with the details and specifications.
LibraryCT
Posted
Aug 27, 2026
Oct 2, 2026
Work consists of: installation and maintenance of construction entrance and erosion and sediment controls, clearing and grubbing, selective demolition, site lighting; underground conduits and sleeves, catch basin top, area drain & stormwater piping; asphalt paving; precast concrete curbing; exposed aggregate concrete sidewalks; concrete stairs, stone stairs on concrete; dry laid stone walls; metal handrails; native tree; shrub and perennial plantings