Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
New bridge structure to be constructed and installed on the east side. Structure excavation 24" drilled piers concrete abutments with wingwalls structure backfill.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pedestrian/ Bike Facilities Salem Sidewalks Phase I Sidewalk.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
Pedestrian/ Bike Facilities Salem Sidewalks Phase I Sidewalk.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Provide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.
AvailablePedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailablePedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →