Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Bridge: 39A014 concrete slab on fabricated steel girder span(s): 4 structure steel.
Posted Date
Nov 14, 2025
Due Date
Jan 13, 2026
Release: Nov 14, 2025
Close: Jan 13, 2026
Bridge: 39A014 concrete slab on fabricated steel girder span(s): 4 structure steel.
AvailableProvide services related to the design and construction of a sidewalk corridor project. The purpose of the scope of work is to describe the responsibilities of the consultant and project team in connection with the preparation of construction design plans, construction cost estimates and the required project permitting documents for installation of a 5' sidewalk, featuring a grass buffer to separate the pathway from the edge of the pavement. The sidewalk design will navigate around existing trees, utilities, and drainage swales wherever feasible to minimize construction impact.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Provide services related to the design and construction of a sidewalk corridor project. The purpose of the scope of work is to describe the responsibilities of the consultant and project team in connection with the preparation of construction design plans, construction cost estimates and the required project permitting documents for installation of a 5' sidewalk, featuring a grass buffer to separate the pathway from the edge of the pavement. The sidewalk design will navigate around existing trees, utilities, and drainage swales wherever feasible to minimize construction impact.
Pedestrian bridge repairs.
Posted Date
Oct 14, 2025
Due Date
Dec 12, 2025
Release: Oct 14, 2025
Close: Dec 12, 2025
Pedestrian bridge repairs.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis