Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Traffic Signal and ADA Improvements at the intersection. Including 15 LF sawcutting; 3 SY Superpave Asphalt Mixture Design, Base Course, PG 64S-22, 0.3 To < 3 Million ESALs, 25.0 mm Mix, 6" Depth; 3 SY Subbase 6" Depth (No. 2A); 33 SY Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 0.3 To < 3 Million ESALs, 9.5 mm Mix, 1.5" Depth, SRL-H; 3 SY Superpave Asphalt Mixture Design, Binder Course, PG 64S-22, 0.3 To < 3 Million ESALs, 19.0 mm Mix, 2.5" Depth; 39 SY Asphalt Tack Coat; 30 SY Milling of Asphalt Pavement Surface, 1.5” Depth, Milled Material Retained By Contractor; 5 LF Plain Cement Concrete Curb, 6" Height; 420 LF AWG 8 Underground Cable, Copper, 1 Conductor; 12 SF Post Mounted Signs, Type B; 140 SF Structure Mounted Flat Sheet Aluminum Signs; 230 LF of 2" conduit; 315 LF of 3" conduit; 85 LF Trench and Backfill, Type I; 70 LF Trench and Backfill, Type II; 235 LF Trench and Backfill, Type III; 420 LF Signal Cable, 14 AWG, 3 Conductor; 1,140 LF Signal Cable, 14 AWG, 5 Conductor. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Traffic signal and ADA improvements. Including 10 SY Superpave Asphalt Mixture Design, Base Course, PG 64S-22, 0.3 To < 3 Million ESALs, 25.0 mm Mix, 6” Depth; 10 SY Subbase 6” Depth (No. 2A); 26 SY Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 0.3 To < 3 Million ESALs, 9.5 mm Mix, 1.5” Depth, SRL-H; 10 SY Superpave Asphalt Mixture Design, Binder Course, PG 64S-22, 0.3 To < 3 Million ESALs, 19.0 mm Mix, 2.5” Depth; 46 SY Asphalt Tack Coat; 16 SY Milling of Asphalt Pavement Surface, 1.5" Depth, Milled Material Retained By Contractor; 40 LF Plain Cement Concrete Curb, 6” Height; 27 SY Driveway Aprons and Sidewalks Through Driveways; 16 SF Detectable Warning Surface, Cast Iron; 360 LF AWG 8 Underground Cable, Copper, 1 Conductor; 11 SF Post Mounted Signs, Type B; 22 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Sheet Aluminum Signs; 200 LF of 2" Conduit; 240 LF of 3" Conduit; 635 LF Signal Cable, 14 AWG, 3 Conductor; 1,165 LF Signal Cable, 14 AWG, 5 Conductor; 410 LF AWG 8 Underground Cable, Copper, 1 Conductor; 445 LF Signal Cable, 14 AWG, 3 Conductor; 1,070 LF Signal Cable, 14 AWG, 5 Conductor. See attached file.
Posted Date
Jan 12, 2026
Due Date
Feb 18, 2026
Release: Jan 12, 2026
Close: Feb 18, 2026
Traffic signal and ADA improvements. Including 10 SY Superpave Asphalt Mixture Design, Base Course, PG 64S-22, 0.3 To < 3 Million ESALs, 25.0 mm Mix, 6” Depth; 10 SY Subbase 6” Depth (No. 2A); 26 SY Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, 0.3 To < 3 Million ESALs, 9.5 mm Mix, 1.5” Depth, SRL-H; 10 SY Superpave Asphalt Mixture Design, Binder Course, PG 64S-22, 0.3 To < 3 Million ESALs, 19.0 mm Mix, 2.5” Depth; 46 SY Asphalt Tack Coat; 16 SY Milling of Asphalt Pavement Surface, 1.5" Depth, Milled Material Retained By Contractor; 40 LF Plain Cement Concrete Curb, 6” Height; 27 SY Driveway Aprons and Sidewalks Through Driveways; 16 SF Detectable Warning Surface, Cast Iron; 360 LF AWG 8 Underground Cable, Copper, 1 Conductor; 11 SF Post Mounted Signs, Type B; 22 SF Post Mounted Signs, Type F; 30 SF Structure Mounted Flat Sheet Aluminum Signs; 200 LF of 2" Conduit; 240 LF of 3" Conduit; 635 LF Signal Cable, 14 AWG, 3 Conductor; 1,165 LF Signal Cable, 14 AWG, 5 Conductor; 410 LF AWG 8 Underground Cable, Copper, 1 Conductor; 445 LF Signal Cable, 14 AWG, 3 Conductor; 1,070 LF Signal Cable, 14 AWG, 5 Conductor. See attached file.
AvailableResurfacing, patching, ADA improvements, traffic signal improvements and structure improvements.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Resurfacing, patching, ADA improvements, traffic signal improvements and structure improvements.
AvailableTraffic signal improvements project.
Posted Date
Jan 12, 2026
Due Date
Feb 26, 2026
Release: Jan 12, 2026
Close: Feb 26, 2026
Traffic signal improvements project.
AvailableTraffic signal system and ADA improvements. 2614 SF - 4" & 6" concrete walk.
Posted Date
Nov 20, 2025
Due Date
Feb 3, 2026
Release: Nov 20, 2025
Close: Feb 3, 2026
Traffic signal system and ADA improvements. 2614 SF - 4" & 6" concrete walk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis