CountyTX
Posted
Oct 13, 2026
Nov 10, 2026
Upper East Fork Laterals FRS #9 Dam Rehabilitation RFP
Work includes approx 1,000 CY excavation, common; 59,820 SY topsoil; 40 LF of reinforced concrete pipe; 1,970 LF of field fence.
Description: Work includes approx 13.6 AC clearing and grubbing; 1 LS irrigation system; 34,000 CY common excavation; 170 LF temporary fence; 40 LF 6" DIP.
County · TX, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Kaufman County.
Adjacent opportunities open for bidding right now.
CountyTX
Posted
Oct 13, 2026
Nov 10, 2026
Work includes approx 1,000 CY excavation, common; 59,820 SY topsoil; 40 LF of reinforced concrete pipe; 1,970 LF of field fence.
CityMI
Posted
Oct 6, 2026
Nov 5, 2026
Work consists of: soil erosion & sedimentation control, including obtaining the sesc permit for the project; staking and layout of proposed improvements, with support and confirmation from engineer temporary water control measures as required; repair or replacement of steel radial gates including removal of existing hoist equipment and replacement with new hoist frame, cleaning and coating existing steel gates; cured-in-place lining of existing corrugated metal pipe culvert outlets within the dam; right embankment repair; grading and riprap installation along the downstream toe of the dam with bedding stone, filter sand, drainage stone and filter fabric; repair of spillway concrete including shallow and deep repairs and crack injection and route/seal; turf restoration for all areas disturbed during construction; restoration of gravel access route, if disturbed during construction, related work.
Posted
Oct 2, 2026
Oct 30, 2026
General Project Description/Summary: mobilization of labor, equipment, and materials to the site as needed to complete the work; installation of soil erosion and sediment control devices; installation of control of water and stream diversion devices to maintain streamflow during the work; establish staging area as required to complete the work; demolish and remove existing concrete baffle chute spillway, sidewalls, and downstream riprap; install sand and gravel filter materials beneath proposed spillway slab; construct reinforced concrete wingwalls, cantilever retaining walls, crest slab, and upstream cutoff wall; construct reinforced concrete primary spillway chute and concrete-lined stilling basin, including chute blocks, baffle blocks, and end sill; install toe drain along the dam embankment; establish permanent turf on the embankment when all work is completed; restore the staging area and the construction entrance provided for site access following completion of all work; maintain control of water at all times during construction.
Posted
Oct 14, 2026
Nov 12, 2026
Project includes the installation, maintenance, and removal of erosion and sediment control measures. Installation, implementation, and coordination of traffic control plan, and removal at completion of construction. Stripping and stockpiling topsoil. Demolition of existing concrete dam and associated infrastructure. Control of surface water and dewatering of subgrades in areas of work. Excavation and placement of select fill, topsoil and seeding.