13,000 Tons of Screened Road Sand RFP
Purchase of up to 13,000 tons of screened road sand.
Description: Lower drennen road 1-1/2" (840 tons) or 2" (1120 tons) thick wma 9.5 mm wearing course overlay (9350 SY).
City · PA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Township of Upper Burrell.
Adjacent opportunities open for bidding right now.
CityNY
Aug 5, 2026
Closes
Sep 8, 2026
Purchase of up to 13,000 tons of screened road sand.
CountyGA
Aug 3, 2026
Closes
Aug 28, 2026
Work consists of approximately 320 tons of 9.5 mm asphalt, 480 tons of 12.5 mm asphalt, 4,300 SY of 6-inch graded aggregate base course, 890 LF of 6-inch x 24-inch curb & gutter, 880 SY of 4-inch concrete sidewalk, 220 LF of 18-inch HDPE storm drain, 200 LF of 24- inch HDPE storm drain, 44 LF of 18-inch RCP storm drain, (2) 24-inch concrete headwalls, (2) grate top drop inlets, (1) manhole, (1) junction box, 200 SY of type 3 rip rap, 3,300 LF of 5-inch white pavement striping, 240 LF of 5-inch yellow pavement striping, 40 LF of 24-inch pavement striping, pavement markings, roadway and parking lot signage, mass grading, traffic and erosion control measures.
CountyTX
-
Closes
Sep 16, 2026
Guadalupe County is soliciting bids under IFB 26-19 for the Stagecoach Road Overlay Phase 2 project through its designated BidNet Direct/Texas Purchasing Group procurement portal. The detail page shows a publication date of 08/18/2026 and a bid deadline of 09/16/2026 at 02:00 PM CDT, which is still future relative to 2026-08-19. The public page labels the item as an IFB and contains no grant-program language, scope text, or publicly accessible primary bid file; those details and documents are restricted to registered members.
CityIA
Aug 4, 2026
Closes
Aug 27, 2026
Water Main Extension Project is adjacent to East Second Street and Harris Drive within the City of Webster City. The project consists of approximately 840 LF of 8” PVC trenched water main with fittings; 109 LF of 8” PVC trenchless water main with steel casing; 1 each 1-inch water service; 2 each fire hydrants; 51 LF of 15-inch diameter CMP trenched culvert pipe; 2 each 15-inch diameter CMP pipe aprons; 19 SY of 7-inch thick PCC driveway pavement; 32 tons of 8-inch thick driveway gravel; temporary traffic control; erosion control and seeding; and various related removals and improvements.