Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Rochelle Park
Work includes the decommissioning of the existing wastewater pumping station, and the installation of a new pumping station. Principal items of work in the project include: Construction of sanitary pumping station, foundations, including building, pumps, piping, valving, appurtenances, and all associated electrical work. Construction of comminutor chamber, including comminutors, bar screen, piping, appurtenances, and all associated electrical work. Installation of generator, including all associated electrical work and foundations. Installation of force main, manholes, gravity sewer lines and appurtenances. Installation of jib crane and yard hydrant. Instrumentation and Controls and all associated electrical work. Decommissioning and demolition of the existing sanitary pumping station.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Elizabethtown Area Regional Authority
Sewage pumping station upgrade: Expansion of the existing 250-gallon-per-minute (gpm) buried packaged pumping station to a 400-gpm submersible sewage pumping station, along with the installation of approx. 1,640 LF of 6" sewage force main in parallel with the existing 4" force main and installation of approx. 255 LF of 8-inch gravity sewer main. Work includes installation of an owner-procured package pump station and control system, a new channel grinder, an 8-foot by 8-foot precast wet well, temporary electrical connections, a new electrical service entrance, modifications to the existing generator building, precast manhole structures and yard piping, site paving, fencing, grading, demolition of all existing pumping station facilities, and maintenance of sanitary sewer flows throughout construction.
Posted Date
Oct 28, 2025
Due Date
Dec 16, 2025
Release: Oct 28, 2025
Elizabethtown Area Regional Authority
Close:
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Sewage pumping station upgrade: Expansion of the existing 250-gallon-per-minute (gpm) buried packaged pumping station to a 400-gpm submersible sewage pumping station, along with the installation of approx. 1,640 LF of 6" sewage force main in parallel with the existing 4" force main and installation of approx. 255 LF of 8-inch gravity sewer main. Work includes installation of an owner-procured package pump station and control system, a new channel grinder, an 8-foot by 8-foot precast wet well, temporary electrical connections, a new electrical service entrance, modifications to the existing generator building, precast manhole structures and yard piping, site paving, fencing, grading, demolition of all existing pumping station facilities, and maintenance of sanitary sewer flows throughout construction.
AvailableNew Orleans Sewerage and Water Board
Overhaul of old carrollton underpass pumping station.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
New Orleans Sewerage and Water Board
Close: Dec 9, 2025
Overhaul of old carrollton underpass pumping station.
AvailableCity of Milwaukee
Vendor service contract for pumping station battery system replacement project.
Posted Date
Oct 30, 2025
Due Date
Dec 4, 2025
Release: Oct 30, 2025
City of Milwaukee
Close: Dec 4, 2025
Vendor service contract for pumping station battery system replacement project.
AvailableChester Water Authority
Pumping station reliability improvements: Contract 26-001 – General Construction, Contract 26-002 – Electrical Construction, Contract 26-003 – HVAC Construction. The Project generally comprises modifications to the existing Pump Station which pumps 30 MGD of raw water from the Susquehanna River to the Octoraro Water Treatment Plant. Modifications include but are not limited to, replacement of three existing pumps and installation of two new generators. The existing dry chemical system will also be replaced with a liquid chemical system. Electrical work includes the replacement in kind of the existing transformer as well as the installation of a new switchgear building to hold new switchgear equipment and VFDs for the new pumps. Work also includes the demolition of an existing building and the addition of a small building adjacent to the existing pump station for storage and handling of the liquid chemical system.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Chester Water Authority
Close: Jan 14, 2026
Pumping station reliability improvements: Contract 26-001 – General Construction, Contract 26-002 – Electrical Construction, Contract 26-003 – HVAC Construction. The Project generally comprises modifications to the existing Pump Station which pumps 30 MGD of raw water from the Susquehanna River to the Octoraro Water Treatment Plant. Modifications include but are not limited to, replacement of three existing pumps and installation of two new generators. The existing dry chemical system will also be replaced with a liquid chemical system. Electrical work includes the replacement in kind of the existing transformer as well as the installation of a new switchgear building to hold new switchgear equipment and VFDs for the new pumps. Work also includes the demolition of an existing building and the addition of a small building adjacent to the existing pump station for storage and handling of the liquid chemical system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.