Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of Construction Inspection Services for the Londonderry Spring Hill Road Culvert Replacement Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Londonderry, Vermont, is soliciting Construction Inspection Services for the replacement of an existing 72-inch culvert on Spring Hill Road (TH #41) at Eddy Brook with a new 20-foot box culvert and all related site work. The response deadline for services is January 16, 2026. The construction phase is anticipated to be bid in late January 2026, with completion scheduled by November 30, 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Londonderry, Vermont, is soliciting Construction Inspection Services for the replacement of an existing 72-inch culvert on Spring Hill Road (TH #41) at Eddy Brook with a new 20-foot box culvert and all related site work. The response deadline for services is January 16, 2026. The construction phase is anticipated to be bid in late January 2026, with completion scheduled by November 30, 2026.
Replacement of a culvert, approx. 650 LF. The existing box culvert will be replaced with a new, polymer-coated pipe arch structure. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
Posted Date
Dec 12, 2025
Due Date
Jan 6, 2026
Release: Dec 12, 2025
Close: Jan 6, 2026
Replacement of a culvert, approx. 650 LF. The existing box culvert will be replaced with a new, polymer-coated pipe arch structure. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
AvailablePrepare an excavation bid for the ward brook road culvert replacement. The new culvert is an 11' x 3.5' x 38' long single radius pipe arch with concrete footings and headwalls.
Posted Date
Dec 10, 2025
Due Date
Dec 29, 2025
Release: Dec 10, 2025
Close: Dec 29, 2025
Prepare an excavation bid for the ward brook road culvert replacement. The new culvert is an 11' x 3.5' x 38' long single radius pipe arch with concrete footings and headwalls.
AvailableRoad culvert replacement.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
Road culvert replacement.