Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Resurfacing project to include surface milling and overlay with bituminous pavement wearing course.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Placing approx. (2,053 SY at 200 lbs. per square yard) Type C hotlaid asphalt cement over a stone base; placing approx. 400 LF of concrete curb and gutter; the parking lot located in front of the EOC will include parking spaces 20' in length, 9' in width, one line on each side, and two lines of parking in the center of the lot, three handicap spaces, including one being van accessible; include milling of 4,297 SY of the existing pavement at a 2" depth before placing asphalt at 165 lb. per square yard.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
Placing approx. (2,053 SY at 200 lbs. per square yard) Type C hotlaid asphalt cement over a stone base; placing approx. 400 LF of concrete curb and gutter; the parking lot located in front of the EOC will include parking spaces 20' in length, 9' in width, one line on each side, and two lines of parking in the center of the lot, three handicap spaces, including one being van accessible; include milling of 4,297 SY of the existing pavement at a 2" depth before placing asphalt at 165 lb. per square yard.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Oro Valley is seeking bids for the resurfacing of the Community Center Parking Lot. The selected contractor will be responsible for all work associated with resurfacing the designated parking area. Bids are due by February 12, 2026, at 1:30 p.m. Local AZ Time.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
The Town of Oro Valley is seeking bids for the resurfacing of the Community Center Parking Lot. The selected contractor will be responsible for all work associated with resurfacing the designated parking area. Bids are due by February 12, 2026, at 1:30 p.m. Local AZ Time.
AvailableWork consists of parking lot project.
Posted Date
Jan 3, 2026
Due Date
Jan 28, 2026
Release: Jan 3, 2026
Close: Jan 28, 2026
Work consists of parking lot project.
AvailableThe project involves removal of existing macadam/gravel, grading of the subgrade, installation of concrete curbing, and bituminous paving.
Posted Date
Jan 13, 2026
Due Date
Feb 5, 2026
Release: Jan 13, 2026
Close: Feb 5, 2026
The project involves removal of existing macadam/gravel, grading of the subgrade, installation of concrete curbing, and bituminous paving.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →