Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves removal of existing macadam/gravel, grading of the subgrade, installation of concrete curbing, and bituminous paving.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of parking lot project.
Posted Date
Jan 3, 2026
Due Date
Jan 28, 2026
Release: Jan 3, 2026
Close: Jan 28, 2026
Work consists of parking lot project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for Design Services for parking lot improvements to the Strawberry Lot, with an optional bid for the Peach Lot.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
This RFP is for Design Services for parking lot improvements to the Strawberry Lot, with an optional bid for the Peach Lot.
AvailableApprox 3,252 SY full depth reclamation; 400 LF concrete curb and gutter; 930 ton bituminous pavement; 2,608 sf concrete walk; 1,007 SF 8" concrete pavement; 1 ls traffic control; 1,680 LF striping; 504 SF crosswalks; 500 SY sodding; etc.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Approx 3,252 SY full depth reclamation; 400 LF concrete curb and gutter; 930 ton bituminous pavement; 2,608 sf concrete walk; 1,007 SF 8" concrete pavement; 1 ls traffic control; 1,680 LF striping; 504 SF crosswalks; 500 SY sodding; etc.
AvailableResurfacing project to include surface milling and overlay with bituminous pavement wearing course.
Posted Date
Jan 12, 2026
Due Date
Jan 30, 2026
Release: Jan 12, 2026
Close: Jan 30, 2026
Resurfacing project to include surface milling and overlay with bituminous pavement wearing course.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →