Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide all labor, to include certified welders, as well as parts, materials and equipment necessary to remove and modify the coupler pockets on four (4) EMD MP15AC locomotives to retrofit new or requalified draft gears that will accommodate both self-aligning couplers and non-self-aligning couplers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for labor, parts, materials, and equipment to remove and modify coupler pockets on four EMD MP15AC locomotives, and to supply and install new or requalified draft gears and new self-aligning and non-self-aligning couplers.
Posted Date
Jan 14, 2026
Due Date
Feb 24, 2026
Release: Jan 14, 2026
Close: Feb 24, 2026
This RFP is for labor, parts, materials, and equipment to remove and modify coupler pockets on four EMD MP15AC locomotives, and to supply and install new or requalified draft gears and new self-aligning and non-self-aligning couplers.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.
Posted Date
Dec 30, 2025
Due Date
Mar 31, 2026
Release: Dec 30, 2025
Close: Mar 31, 2026
The Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.
AvailableLease of diesel locomotive hauled passenger coaches.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
Lease of diesel locomotive hauled passenger coaches.
AvailableGenerating station unit 8 recycled water cooling system retrofit.
Posted Date
Mar 31, 2025
Due Date
Mar 31, 2026
Release: Mar 31, 2025
Close: Mar 31, 2026
Generating station unit 8 recycled water cooling system retrofit.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →