Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Generating station unit 8 recycled water cooling system retrofit.
Posted Date
Mar 31, 2025
Due Date
Mar 31, 2026
Release: Mar 31, 2025
Close: Mar 31, 2026
Generating station unit 8 recycled water cooling system retrofit.
AvailableThe Redmond School District is soliciting proposals from qualified Construction Manager/General Contractor (CM/GC) firms for cooling retrofit projects at Sage Elementary School and Terrebonne Community School. The scope includes a new chiller and chilled-water distribution at Sage ES, plus an air-cooled chiller, pumps, associated accessories, split systems for select areas, and a new heating solution for the gym at Terrebonne CS. Proposals must be submitted by the stated due date/time and include all requirements as outlined in the RFP documents obtainable via HMK Company’s bid documents site.
Posted Date
Jan 19, 2026
Due Date
Feb 6, 2026
Release: Jan 19, 2026
Close: Feb 6, 2026
The Redmond School District is soliciting proposals from qualified Construction Manager/General Contractor (CM/GC) firms for cooling retrofit projects at Sage Elementary School and Terrebonne Community School. The scope includes a new chiller and chilled-water distribution at Sage ES, plus an air-cooled chiller, pumps, associated accessories, split systems for select areas, and a new heating solution for the gym at Terrebonne CS. Proposals must be submitted by the stated due date/time and include all requirements as outlined in the RFP documents obtainable via HMK Company’s bid documents site.
The solicitation requests contracting a company to manufacture a new catalyst for the existing Selective Catalytic Reduction (SCR) system at the Brandy Branch Generating Station (units B52-B53). The work requires contractor mobilization to the site to remove and dispose of the existing SCR catalyst and install the new catalyst. The procurement is being posted by JEA and documentation is available on JEA's procurement opportunities page.
Posted Date
Nov 22, 2025
Due Date
Dec 16, 2026
Release: Nov 22, 2025
Close: Dec 16, 2026
The solicitation requests contracting a company to manufacture a new catalyst for the existing Selective Catalytic Reduction (SCR) system at the Brandy Branch Generating Station (units B52-B53). The work requires contractor mobilization to the site to remove and dispose of the existing SCR catalyst and install the new catalyst. The procurement is being posted by JEA and documentation is available on JEA's procurement opportunities page.
Replace the main generator at the Columbia Generating Station, nuclear power generating facility with a boiling water reactor, 1,200-megfawatt electric generation unit, during refuel outage 30.
Posted Date
Nov 12, 2025
Due Date
Feb 5, 2026
Release: Nov 12, 2025
Close: Feb 5, 2026
Replace the main generator at the Columbia Generating Station, nuclear power generating facility with a boiling water reactor, 1,200-megfawatt electric generation unit, during refuel outage 30.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis