Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The solicitation requests contracting a company to manufacture a new catalyst for the existing Selective Catalytic Reduction (SCR) system at the Brandy Branch Generating Station (units B52-B53). The work requires contractor mobilization to the site to remove and dispose of the existing SCR catalyst and install the new catalyst. The procurement is being posted by JEA and documentation is available on JEA's procurement opportunities page.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Contractor to provide all services to upgrade both HRSGs (B52 and B53) ammonia injection lances to an improved lance injection system and to install a sampling grid downstream of the catalyst to facilitate tuning. All instrumentation and valves on the ammonia injection grid (AIG) are to be upgraded or replaced as part of the work.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2026
Release: Nov 20, 2025
Close: Dec 16, 2026
Contractor to provide all services to upgrade both HRSGs (B52 and B53) ammonia injection lances to an improved lance injection system and to install a sampling grid downstream of the catalyst to facilitate tuning. All instrumentation and valves on the ammonia injection grid (AIG) are to be upgraded or replaced as part of the work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Generating station unit 8 recycled water cooling system retrofit.
Posted Date
Mar 31, 2025
Due Date
Mar 31, 2026
Release: Mar 31, 2025
Close: Mar 31, 2026
Generating station unit 8 recycled water cooling system retrofit.
AvailableThe city owns and operates seven Wartsila engines (five 50SG engines and two 34SG engines) that use emissions control catalysts. The catalysts for the 50SG engines are in a HUG EM400 housing, while the catalysts for the 34SG engines are in an HUG EM196 housing. Over time, catalysts degrade and will need to be replaced. This bid is for new catalysts to replace the existing catalysts in the installed Wartsila emissions control systems. The specific types of catalysts being sought are listed below. 3.1 Catalyst Types: The three different catalysts used for emissions control of the Wartsila engines are described below. a. SCR - Used for the catalytic reduction of nitrogen oxides. HUG RFV 1300.103.C5.00.S150.450.000 or equivalent. b. ROM - Used for the catalytic reduction of nitrogen oxides while simultaneously suppressing higher ammonia concentrations. HUG ROM 1300.103.C3.D1.S150.045.255 or equivalent. c. OXI - Used for the catalytic oxidation of CO, VOCs and Formaldehyde. HUG OCT 1500.141.A7.00.S150.150.000 or equivalent.
Posted Date
Jan 19, 2026
Due Date
Feb 17, 2026
Release: Jan 19, 2026
Close: Feb 17, 2026
The city owns and operates seven Wartsila engines (five 50SG engines and two 34SG engines) that use emissions control catalysts. The catalysts for the 50SG engines are in a HUG EM400 housing, while the catalysts for the 34SG engines are in an HUG EM196 housing. Over time, catalysts degrade and will need to be replaced. This bid is for new catalysts to replace the existing catalysts in the installed Wartsila emissions control systems. The specific types of catalysts being sought are listed below. 3.1 Catalyst Types: The three different catalysts used for emissions control of the Wartsila engines are described below. a. SCR - Used for the catalytic reduction of nitrogen oxides. HUG RFV 1300.103.C5.00.S150.450.000 or equivalent. b. ROM - Used for the catalytic reduction of nitrogen oxides while simultaneously suppressing higher ammonia concentrations. HUG ROM 1300.103.C3.D1.S150.045.255 or equivalent. c. OXI - Used for the catalytic oxidation of CO, VOCs and Formaldehyde. HUG OCT 1500.141.A7.00.S150.150.000 or equivalent.
AvailableThe Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.
Posted Date
Dec 30, 2025
Due Date
Mar 31, 2026
Release: Dec 30, 2025
Close: Mar 31, 2026
The Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.