Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of replacing approx. 1,780' of 6" CIP with 8" PVC, designed to be installed utilizing the open-cut method, 20 LF of 6" c909, 1945 LF of 8" c909, 14 EA of 8" MJ gate valve, 1 EA of 8" tapping sleeve and valve, remove existing tee, replace with spigot, 6 EA of 6" solid coupling sleeve, 2 EA of fire hydrant assembly, 2 EA of remove ex. fire hydrant and valve box. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of 0.43 miles of 12" water main replacement,the installation of concrete sidewalk in gap areas where no sidewalk currently exists and misc. Related items of work.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Project consists of 0.43 miles of 12" water main replacement,the installation of concrete sidewalk in gap areas where no sidewalk currently exists and misc. Related items of work.
AvailableBaltimore County Government (MD) issued an IFB to replace a 20-inch water main along Joppa Road between Fairmount Avenue and LaSalle Road, with associated requirements and instructions provided via EMMA and the County’s DPW page. The solicitation was posted November 17, 2025; a pre-bid meeting is scheduled for December 3, 2025, and responses are due January 20, 2026.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Close: Jan 20, 2026
Baltimore County Government (MD) issued an IFB to replace a 20-inch water main along Joppa Road between Fairmount Avenue and LaSalle Road, with associated requirements and instructions provided via EMMA and the County’s DPW page. The solicitation was posted November 17, 2025; a pre-bid meeting is scheduled for December 3, 2025, and responses are due January 20, 2026.
AvailableWater main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
Posted Date
Dec 14, 2025
Due Date
Jan 20, 2026
Release: Dec 14, 2025
Close: Jan 20, 2026
Water main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →