Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase of two (2) lochinvar crest mod-con boilers, p/n lo fbn0751.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Contractor to replace two (2) aerco boilers with two (2) lochinvar boilers. Contractor will disconnect and remove the electrical, gas, water, and flu pipe. Contractor will use a lull to remove the existing boilers and set the new boilers in their place. See attached file for full scope.
Posted Date
Nov 14, 2025
Due Date
Jan 8, 2026
Release: Nov 14, 2025
Close: Jan 8, 2026
Contractor to replace two (2) aerco boilers with two (2) lochinvar boilers. Contractor will disconnect and remove the electrical, gas, water, and flu pipe. Contractor will use a lull to remove the existing boilers and set the new boilers in their place. See attached file for full scope.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractor to replace two (2) aerco boilers with two (2) lochinvar boilers. Contractor will disconnect and remove the electrical, gas, water, and flu pipe. Contractor will use a lull to remove the existing boilers and set the new boilers in their place. See attached file for full scope.
Posted Date
Nov 14, 2025
Due Date
Jan 8, 2026
Release: Nov 14, 2025
Close: Jan 8, 2026
Contractor to replace two (2) aerco boilers with two (2) lochinvar boilers. Contractor will disconnect and remove the electrical, gas, water, and flu pipe. Contractor will use a lull to remove the existing boilers and set the new boilers in their place. See attached file for full scope.
AvailableReplace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Feb 27, 2026
Release: Oct 28, 2025
Close: Feb 27, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailableThis is a presolicitation synopsis for a firm-fixed-price construction contract to replace boilers and controls at the Federal Correctional Institution (FCI) Pekin in Pekin, Illinois. The work includes removing existing boilers, piping, tanks, and installing new boilers, pumps, controls and ensuring compatibility with existing Siemens systems; performance period is 120 calendar days. The opportunity is a 100% small business set-aside with an estimated magnitude of $1,000,000 – $5,000,000 and the solicitation was scheduled to be posted on SAM.gov in early January 2026.
Posted Date
Dec 10, 2025
Due Date
Jan 9, 2026
Release: Dec 10, 2025
Close: Jan 9, 2026
This is a presolicitation synopsis for a firm-fixed-price construction contract to replace boilers and controls at the Federal Correctional Institution (FCI) Pekin in Pekin, Illinois. The work includes removing existing boilers, piping, tanks, and installing new boilers, pumps, controls and ensuring compatibility with existing Siemens systems; performance period is 120 calendar days. The opportunity is a 100% small business set-aside with an estimated magnitude of $1,000,000 – $5,000,000 and the solicitation was scheduled to be posted on SAM.gov in early January 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →