Description: The tender covers construction of drainage work. The contractor must supply all labour, equipment, and materials. The work is to be carried out as outlined in the scope of work, drawings, general conditions, and specifications.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
The Central Marin Sanitation Agency (CMSA) is soliciting applications from contractors licensed in California to be included on its 2026 List of Qualified Contractors under the California Uniform Public Construction Cost Accounting Act (CUPCCAA) for public works projects with estimated values between $75,000 and $220,000. Interested contractors must submit a Contractor's Pre-Qualification Application available from CMSA’s website or by contacting CMSA staff.
The County of Alameda invites all licensed contractors to apply for inclusion on the calendar year 2026 qualified contractors' list for informal procurements conducted under the California Uniform Public Construction Cost Accounting Act (UPCCAA). The list is used for informal procurements (projects under $220,000) and contractors must apply annually to be included. Contractors can register online via the County registration page or submit a letter of interest; questions should be directed to the Building Maintenance Department contact provided on the OpenGov posting.
Provide fiber supplies. 12CT 10,000’ Corning or CommScope Armored/Loose Tube Fiber/Gel Free. 1CT 2,000’ Corning or CommScope Flat Drop/Tonable. 4 Port CommScope HST-B4HNB0100NN00MST 100’ Tail. FOSC450-D6-6NT-0-D6V CommScope or approved equal closure with trays, hanging bracket, entry hardware.
RFP documents & timeline
From the first pre-RFP signals to the published RFP and its files.
Board meeting
517 days before RFP
Dietrich Engineering Limited recommended filling part of the Bahn Municipal Drain and installing approximately 520 metres of 750mm-to-900mm tile and HDPE pipe.
See 2 sourcesHide sources
Recommendations It is our recommendation that: 1. The existing open drain in Lot 31, Concession 14 be filled in by means of a tile drainage system. 2. The new tile drainage system includes the installation of 520 metres of 750mm to 900mm diameter concrete tile and HDPE pipe.
The total estimated construction costs for this project are as follows: A) Total Estimated Construction Costs -- Main Drain (Closed) $ 182,000 Total Estimated Construction Costs $ 182,000 Summary of Estimated Project Costs The total estimated project costs are as follows: Allowances under Section 30 of the Drainage Act, R.S.O. 1990 (Refer to Schedule A) $…
The Township of Perth East provisionally adopted a by-law for construction of the Rohfrietsch Municipal Drain at an estimated cost of $544,882.
See 2 sourcesHide sources
The Corporation of the Township of Perth East Provisional By-Law 111-2025 To Provide For a Drainage Works Known as Rohfrietsch Municipal Drain 2025 Ellice Ward July 15, 2025 Whereas Council received a request for drainage works under Section 78 of the Drainage Act, R.S.O. 1990 serving Parts of Lots 22 to 26, Concession 1, Ellice Ward, Township of Perth…
Board meeting
463 days before RFP
Property owner Mike Hahn requested increased capacity for Branches A and C of the Scheerer Municipal Drain, with engineer appointment proposed for later consideration.
See sourceHide source
To: Council File Code: E09 Prepared By: Tyler Berry, Development Technologist Ashley Carter, Manager of Legislative Services/Municipal Clerk Date: July 15, 2025 Subject: Section 78 Report -- Br A & C of Scheerer Drain -- CLE-2025-22 Attachments: Section 78 Petition and Map Recommendations: That the Council of the Township of Perth East receive the Request…
Township of Perth East Regular Meeting of Council
Board meeting
435 days before RFP
The agenda proposed receiving a signed request for maintenance and repair of the Litt Municipal Drain.
See sourceHide source
Item 5.1.4 Township of Perth East Council Report To: Council File Code: E09 Prepared By: Ashley Carter, Manager of Legislative Services/Municipal Clerk Date: August 12, 2025 Subject: Request for Maintenance and Repair (Section 74) (CLE-2025-30) 1) Litt Municipal Drain 2) Culliton Municipal Drain Attachments: Request for Maintenance & Repair Recommendations:…
We have made an estimate of the cost of the proposed work based on labour, equipment and materials. A detailed description of the costs involved can be found in Schedule B of this report. The total estimated construction costs for this project are as follows: Total Estimated Construction Costs $ 351,350 Summary of Estimated Project Costs The total estimated…