FederalDC
Aug 3, 2026
Closes
Aug 7, 2026
Liri Emergency Roof Repair RFP
Liri emergency roof repair.
Description: The National Park Service issued a combined synopsis/solicitation for the LIRI EMERGENCY ROOF REPAIR project at Little River Canyon National Preserve in Alabama. The contractor must provide labor, materials, equipment, supervision, transportation, and incidentals to remove and replace deteriorated ribbed metal roofing on the maintenance-area gym, with proposals evaluated on cost, technical approach, and relevant experience. It is a firm-fixed-price, total-small-business-set-aside contract under NAICS 238160, with electronic offers due August 7, 2026, at 2:00 p.m. CDT; it is a contract procurement rather than a grant.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalDC
Aug 3, 2026
Closes
Aug 7, 2026
Liri emergency roof repair.
CountyPA
Jul 30, 2026
Closes
Aug 31, 2026
Roof replacement at the existing County Emergency Communications building.
Higher EducationNJ
Jul 13, 2026
Closes
Aug 12, 2026
Project includes the complete roof system removal and replacement of the IT Building roof and thru- wall flashing repair. Work for this project includes the removal of all existing roofing, edge metal, equipment curbs, insulation down to the roof deck, equipment and conduit. Work also includes the installation of new roof insulation throughout, a new KEE roofing system, new edge metal, vents, equipment curbs and replacement masonry.
Jul 30, 2026
Closes
Oct 10, 2026
The Army Contracting Command - Rock Island issued a presolicitation for the repair and replacement of the low-slope roof covering on Building 333 at Rock Island Arsenal, Illinois, under solicitation W519TC-26-R-A067. The project involves replacing approximately 76,600 square feet of deteriorated EPDM roofing and polyisocyanurate insulation with a new fully adhered single-ply EPDM membrane and new insulation, and requires performance and payment bonds. This is an active 100% total small-business set-aside procurement notice, with the formal solicitation and scope documents anticipated to be issued later.
Procurement and program contacts connected to Department of Interior.