Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes new storm sewer installation (up to 30"), partial sanitary sewer installation (up to 30"), CSO 018 modification, sanitary sewer lateral replacement, partial water main replacement, water service replacement, pavement reconstruction, new concrete curb and gutter, and sidewalk at along with incidental construction on adjacent streets, and other pertinent work as described in the project documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include reconstruction of the anacostia avenue bridge.
Posted Date
Jan 6, 2026
Due Date
Feb 20, 2026
Release: Jan 6, 2026
Close: Feb 20, 2026
Work include reconstruction of the anacostia avenue bridge.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of pedestrian and traffic signalization, ADA ramps, sidewalks, and striping at Lobdell Ave / Goodwood Blvd and Lobdell Ave / Seven Oaks Ave intersections.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Construction of pedestrian and traffic signalization, ADA ramps, sidewalks, and striping at Lobdell Ave / Goodwood Blvd and Lobdell Ave / Seven Oaks Ave intersections.
AvailableWork includes reconstruction of the intersection. 14 ls maintenance of traffic; 700 ed work zone sign; 7874.02 fd channelizing device - pedestrian lcd; 126 ed type iii barricade; 310.47 lf sediment barrier; 3 ea soil tracking prevention device; 5 ea inlet protection device; 0.34 ac clearing and grubbing - lump sum/acre; 43.40 sy removal of existing concrete pavement/removal of existing concrete - sidewalk; 165.16 sy removal of existing concrete pavement/removal of existing concrete - curb and gutter; 10.96 sy removal of existing concrete pavement/removal of existing concrete - drainage structures and pipes; 77.41 cy regular excavation; 462.72 cy embankment; 709.26 sy type b stabilization. See outside link.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Work includes reconstruction of the intersection. 14 ls maintenance of traffic; 700 ed work zone sign; 7874.02 fd channelizing device - pedestrian lcd; 126 ed type iii barricade; 310.47 lf sediment barrier; 3 ea soil tracking prevention device; 5 ea inlet protection device; 0.34 ac clearing and grubbing - lump sum/acre; 43.40 sy removal of existing concrete pavement/removal of existing concrete - sidewalk; 165.16 sy removal of existing concrete pavement/removal of existing concrete - curb and gutter; 10.96 sy removal of existing concrete pavement/removal of existing concrete - drainage structures and pipes; 77.41 cy regular excavation; 462.72 cy embankment; 709.26 sy type b stabilization. See outside link.
AvailableClackamas County requests proposals for A&E and related services for improvements along SE Sunnyside Road between 132nd Ave and 172nd Ave. This is a qualifications-based selection (QBS) with FHWA funding, advertised on OregonBuys and requiring electronic submission via BidLocker. Issued December 18, 2025, proposals are due by January 20, 2026 at 2:00 PM PST.
Posted Date
Dec 19, 2025
Due Date
Jan 20, 2026
Release: Dec 19, 2025
Close: Jan 20, 2026
Clackamas County requests proposals for A&E and related services for improvements along SE Sunnyside Road between 132nd Ave and 172nd Ave. This is a qualifications-based selection (QBS) with FHWA funding, advertised on OregonBuys and requiring electronic submission via BidLocker. Issued December 18, 2025, proposals are due by January 20, 2026 at 2:00 PM PST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →