The City of Charlotte is soliciting construction bids for the Hill Street Storm Drainage Improvement Project to mitigate flooding and repair failing storm drainage infrastructure within a defined project boundary. The procurement is an Invitation for Bid with an estimated total project value of $1,000,000–$4,999,999 and a one-year contract term. The solicitation is listed as Upcoming with an anticipated posting date of 2027-08-15 and no close date specified yet.
The City of Charlotte is soliciting construction bids for the Hill Street Storm Drainage Improvement Project to mitigate flooding and repair failing storm drainage infrastructure within a defined project boundary. The procurement is an Invitation for Bid with an estimated total project value of $1,000,000–$4,999,999 and a one-year contract term. The solicitation is listed as Upcoming with an anticipated posting date of 2027-08-15 and no close date specified yet.
Newport Township is soliciting sealed bids for the 2026 Park Street Storm Drainage Improvement Project in the Glen Lyon area. The project includes approximately 140 linear feet of 24-inch HPDE pipe, 4 storm inlets, 70 square yards of concrete sidewalk, 130 linear feet of concrete curb, pavement restoration, and miscellaneous related work. This is a construction bid solicitation (not a grant program), with bids due to be received by the Township by the stated deadline in July 2026.
Newport Township is soliciting sealed bids for the 2026 Park Street Storm Drainage Improvement Project in the Glen Lyon area. The project includes approximately 140 linear feet of 24-inch HPDE pipe, 4 storm inlets, 70 square yards of concrete sidewalk, 130 linear feet of concrete curb, pavement restoration, and miscellaneous related work. This is a construction bid solicitation (not a grant program), with bids due to be received by the Township by the stated deadline in July 2026.
The Nevada Tahoe Conservation District (NTCD), in collaboration with the Nevada Department of Transportation, is soliciting sealed bids from qualified contractors for construction of the Hogan Court Drainage Improvement Project on private property and within Washoe County right-of-way near 699 Hogan Court in Incline Village, Nevada. The work consists of installing approximately 440 linear feet of underground storm drain pipe, three storm drain structures, removal and replacement of asphalt concrete paving, and minor grading to fill in an existing stormwater diversion ditch (total project cost is $350,000, funded by NDOT). Sealed bids are due in person or by email to NTCD's office at 400 Dorla Court, Zephyr Cove, NV until 3:00 pm local time on Tuesday, July 28, 2026, with an optional pre-bid conference held on July 15, 2026 at 1:00 PM at 699 Hogan Court, Incline Village, NV.
The Piccadilly Storm Drainage Improvement Project aims to improve storm drainage infrastructure, including pipe systems and culverts, to reduce flooding. The project also focuses on enhancing degraded stream reaches to reduce erosion and improve water quality within the designated area. It is currently listed as an upcoming construction project for Charlotte Storm Water Services with an anticipated posting date in late 2027.
The Piccadilly Storm Drainage Improvement Project aims to improve storm drainage infrastructure, including pipe systems and culverts, to reduce flooding. The project also focuses on enhancing degraded stream reaches to reduce erosion and improve water quality within the designated area. It is currently listed as an upcoming construction project for Charlotte Storm Water Services with an anticipated posting date in late 2027.
Win Opportunities Before the RFP
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
The Nevada Tahoe Conservation District (NTCD), in collaboration with the Nevada Department of Transportation, is soliciting sealed bids from qualified contractors for construction of the Hogan Court Drainage Improvement Project on private property and within Washoe County right-of-way near 699 Hogan Court in Incline Village, Nevada. The work consists of installing approximately 440 linear feet of underground storm drain pipe, three storm drain structures, removal and replacement of asphalt concrete paving, and minor grading to fill in an existing stormwater diversion ditch (total project cost is $350,000, funded by NDOT). Sealed bids are due in person or by email to NTCD's office at 400 Dorla Court, Zephyr Cove, NV until 3:00 pm local time on Tuesday, July 28, 2026, with an optional pre-bid conference held on July 15, 2026 at 1:00 PM at 699 Hogan Court, Incline Village, NV.