Lincoln Park Middle School Dehumidification and Generator Improvements RFP
Description: Work includes work scopes, 01 mechanical (district code 1356) and 02 electrical (district code 1360) for all the work necessary for upgrading the existing mechanical systems and providing a new generator.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
1 file available
Board meeting
214 days before RFP
The district planned Lincoln Park Middle School HVAC and controls work for summer 2027 while commissioning staff investigated required repairs.
See 2 sourcesHide sources
along with uh Denfeld and Lincoln Park getting some HVAC commissioning and control work. And then in the summer of 2028, we're tracking to be at East High in Ordin East Middle to do the same thing, some new HVAC and control type work. So, our construction progress. So, at Lincoln Park, we're currently sitting at 65% complete. Um, currently working in the…
HR / Business Services Committee Committee Meeting
And then, next summer, summer of 2007, they'll be working on the Denfeld High School H vac and controls and the Lincoln Park Middle School H vac and controls.
Duluth Public Schools Regular School Board Meeting
The board was reported to have approved the secondary-school LTFM phase containing the Lincoln Park HVAC and controls project, which was entering design for summer 2027.
See 2 sourcesHide sources
two items on here. So summer 2027, we're currently in design for the Denfield High School HBAC and controls project. Same thing for the the Lincoln Park Middle School HBAC and controls. Um those are are getting spun up and and going through the design process. And then about this time next year for the summer 2028 projects, we'll be in the design process…
RFP published
Bidding_Documents_-_10-23-26ZIP
Proposals due (14 days left)
HR / Business Services Committee Committee Meeting
Pre-Construction • Lakewood Boiler Plant Replacement • Contractor & material procurement are in progress • Stowe Roofing Replacement • Work scheduled to start in June • Denfeld & Lincoln HVAC and Controls Projects • Both projects are in the Schematic Design phase • The work is planned for summer of 2027
Installation 40 fixed generators, 10 hookups for portable generators and 5 portable generators with concrete pads, transfer switches, conduit, wiring, and all other appurtenances necessary for complete installation.
Installation 40 fixed generators, 10 hookups for portable generators and 5 portable generators with concrete pads, transfer switches, conduit, wiring, and all other appurtenances necessary for complete installation.
The Project consists of the construction of adding AC and the replacement of the existing mechanical equipment, air handler, and boilers in the mechanical mezzanine in the weight room.
Provide the installation of emergency standby generators. Improvements include automatic transfer switches, generator pads, associated wiring and conduit, electrical panel upgrades, transformers, electrical service modifications, and other related electrical improvements.