City of Branson
Remove up to eleven (11) existing submersible wastewater pumps for inspection and evaluation by the pump manufacturer’s area representative(s). Those pumps found to be of adequate condition for repair will be refurbished and placed back in service. Those pumps found not to be of adequate condition for refurbishment will be replaced based on the lowest and best bid for each application as provided in this RFB. Bids will be received for replacement pumps as indicated on the pricing page. Replacement pumps will not be purchased if the existing pump is in adequate condition to refurbish as determined by the City.
City of Bismarck
The project primarily consists of installing a UV treatment system to the existing wastewater treatment plant, construction of a new lift station facility and equipment replacement in an existing lift station.
City of Mantorville
Lift station construction with gravity sewer and connection to existing forcemain. 1,000' sanitary sewer; 530' sanitary sewer by hdd; 6 sanitary manholes; 1 lift station, valve vault and piping.
City of Bethel
The project scope consists of replacing the pumps, controls, and heat add system for the QFC lift station and providing temporary bypass pumping.