Logo

starbridge

Book a Demo
RFPs/Structural Rehabilitation of Lift Station 27 *RE-BID*

Structural Rehabilitation of Lift Station 27 *RE-BID*

City of Daytona Beach

Summary

Work includes removal and replacement of existing interior wood stud wall, existing wooden floor joists and decking covering the wet well will be removed and replaced with steel beams and 1/4" tread plate, ducting will be plumbed through the tread plate, exterior doors will be installed and replaced, and an exhaust fan will be installed in an existing window opening, Waste water By-Pass Pumping.

Files

Structural Rehabilitation of Lift Station 27 *RE-BID*

zip

Details

Release

Dec 18, 2024

Close

Jun 13, 2025

Contacts

Source