Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition outlined in this contract which will include but not limited to: pumps base demolition; pipe pedestals; old seal water system station; new construction: new pump bases; new pipe pedestals; new seal water system; new backflow preventer mounted to the wall with a new stainless steel bracket; new exhaust fans and ductwork (3); installation of two (2) new fluid engineering series 723 eliminator self-cleaning strainer, along with four (4) 20 in dezurik butterfly isolation valves and four (4) 20 in victaulic couplings. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes installation of a new recessed wet well mounted pump station within a new below grade concrete and wood framed constructed building structure at the wastewater treatment plant includes site work, demolition work, removal and relocation of existing garage structure, earthwork, ledge removal, backfill and compaction, cast-in-place concrete structures, wood framed building, main pump station equipment and controls, drain pump station equipment and controls, all associated process piping and supports, approximately 360 LF of 10" DI force main piping, 1" cts pe process water piping and underground fiber option cable in a common trench; loam and seed, erosion control, temporary pumping, test pits, metals, electrical, scada system modifications, heating and ventilation, and all incidentals for the complete installation of a new main pump station
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes installation of a new recessed wet well mounted pump station within a new below grade concrete and wood framed constructed building structure at the wastewater treatment plant includes site work, demolition work, removal and relocation of existing garage structure, earthwork, ledge removal, backfill and compaction, cast-in-place concrete structures, wood framed building, main pump station equipment and controls, drain pump station equipment and controls, all associated process piping and supports, approximately 360 LF of 10" DI force main piping, 1" cts pe process water piping and underground fiber option cable in a common trench; loam and seed, erosion control, temporary pumping, test pits, metals, electrical, scada system modifications, heating and ventilation, and all incidentals for the complete installation of a new main pump station
AvailableInstallation of a chemical feed system, sodium thiosulfate, for wastewater effluent dechlorination. Installing underground chemical feed piping and tubing. Installation of open-channel flow measurement instrumentation and metal v-notch weirs. Electrical improvements related thereto. SCADA integration. Restoration of disturbed areas.
Posted Date
Jan 2, 2026
Due Date
Jan 27, 2026
Release: Jan 2, 2026
Close: Jan 27, 2026
Installation of a chemical feed system, sodium thiosulfate, for wastewater effluent dechlorination. Installing underground chemical feed piping and tubing. Installation of open-channel flow measurement instrumentation and metal v-notch weirs. Electrical improvements related thereto. SCADA integration. Restoration of disturbed areas.
AvailableThe project consists of rehabilitating the existing Regional Water Treatment Plant by replacing the existing electrical actuators for the filters and softener process valves, removal of the existing filter and softener media and replacement with new media, rehabilitation of the existing filter and softener vessels, addition of a new waste holding basin, and rehabilitation of the existing waste holding basin circular sludge collection system equipment for Waste Holding Basin #2.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
The project consists of rehabilitating the existing Regional Water Treatment Plant by replacing the existing electrical actuators for the filters and softener process valves, removal of the existing filter and softener media and replacement with new media, rehabilitation of the existing filter and softener vessels, addition of a new waste holding basin, and rehabilitation of the existing waste holding basin circular sludge collection system equipment for Waste Holding Basin #2.
Preliminary Assessment, Inspection, and Preliminary Design services for the rehabilitation of clarifiers at the City of Watertown's Wastewater Treatment Plant.
Posted Date
Jan 13, 2026
Due Date
Mar 31, 2026
Release: Jan 13, 2026
Close: Mar 31, 2026
Preliminary Assessment, Inspection, and Preliminary Design services for the rehabilitation of clarifiers at the City of Watertown's Wastewater Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis