Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Requesting proposals from qualified contractors for furnishing all necessary materials, machinery, tools, equipment, labor, and supervision for the Lift Station No. 1 and Force Main Replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Premium
Access the largest public sector contact database
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
AvailablePump Station No. 82 and Force Main Replacement.
Posted Date
Oct 24, 2025
Due Date
Dec 12, 2025
Release: Oct 24, 2025
Close: Dec 12, 2025
Pump Station No. 82 and Force Main Replacement.
This project's work consists of the replacement of the Lift Station, associated sanitary sewer extensions, and force main replacement.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
This project's work consists of the replacement of the Lift Station, associated sanitary sewer extensions, and force main replacement.
AvailableWork includes 1 LS of traffic control; 216 LF of 8-12" PVC sewer main; 7,463 LF of 10" C900 PVC force main; 5 EA of manhole structure; 1 LS of new lift station B- 55ft deep wet well, valve vault, and appurtenance; 115 LF of water main; 2,838 TN of aggregate base course; 87 TN of asphalt; 166 LF of storm sewer/ culvert.
Posted Date
Nov 25, 2025
Due Date
Dec 19, 2025
Release: Nov 25, 2025
Close: Dec 19, 2025
Work includes 1 LS of traffic control; 216 LF of 8-12" PVC sewer main; 7,463 LF of 10" C900 PVC force main; 5 EA of manhole structure; 1 LS of new lift station B- 55ft deep wet well, valve vault, and appurtenance; 115 LF of water main; 2,838 TN of aggregate base course; 87 TN of asphalt; 166 LF of storm sewer/ culvert.