Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS construction activities for lift station n-07; 1 ls construction activities for proposed n-7 meter vault; 1 LS base 20 hp pumps, settables and installation ; 1 LS electrical and instrumentation for 20 hp pumps; 1 LS construction activities for the aerial force main replacement; 1 LS new aluminum railings, fencing and gates including signed and sealed drawings by specialty engineer; 50 LF epoxy sealing of concrete cracks; 40 CF concrete repair; 50 LF new epoxy set rebar installation; 1 LS pre-trenching; 1 LS upgraded 25 hp pumps, settables and installation ; 1 LS upgraded electrical and instrumentation for 25 hp pumps. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 1 LS construction activities for lift station n-07; 1 ls construction activities for proposed n-7 meter vault; 1 LS base 20 hp pumps, settables and installation ; 1 LS electrical and instrumentation for 20 hp pumps; 1 LS construction activities for the aerial force main replacement; 1 LS new aluminum railings, fencing and gates including signed and sealed drawings by specialty engineer; 50 LF epoxy sealing of concrete cracks; 40 CF concrete repair; 50 LF new epoxy set rebar installation; 1 LS pre-trenching; 1 LS upgraded 25 hp pumps, settables and installation ; 1 LS upgraded electrical and instrumentation for 25 hp pumps. See outside link.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Work includes 1 LS construction activities for lift station n-07; 1 ls construction activities for proposed n-7 meter vault; 1 LS base 20 hp pumps, settables and installation ; 1 LS electrical and instrumentation for 20 hp pumps; 1 LS construction activities for the aerial force main replacement; 1 LS new aluminum railings, fencing and gates including signed and sealed drawings by specialty engineer; 50 LF epoxy sealing of concrete cracks; 40 CF concrete repair; 50 LF new epoxy set rebar installation; 1 LS pre-trenching; 1 LS upgraded 25 hp pumps, settables and installation ; 1 LS upgraded electrical and instrumentation for 25 hp pumps. See outside link.
AvailableConstruction of a new lift station and approximately 730 LF of 8 IN force main, construction of approximately 55 LF of 8 IN sanitary sewer, construction of two sanitary sewer manholes, and abandonment of existing lift station including all associated work necessary to complete the work.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Construction of a new lift station and approximately 730 LF of 8 IN force main, construction of approximately 55 LF of 8 IN sanitary sewer, construction of two sanitary sewer manholes, and abandonment of existing lift station including all associated work necessary to complete the work.
AvailableWork includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
Work consists of lift station upgrades.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Work consists of lift station upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Available