Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Kewaskum
Lift station upgrades.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Valdosta
Installation and construction of a sanitary sewage lift station, installation of about 2,200 LF of new gravity sanitary sewer, installation of about 5,800 LF of sewer force main, and other demolition, repair and patching, grading, grassing, and all related work. The Goodyear work consists of installation and construction of a sanitary sewage lift station, installation of about 500 LF of new gravity sanitary sewer, installation of about 750 LF of sewer force main, about 150 LF of watermain, and other demolition, repair and patching, grading, grassing, and all related work. Goodyear Pump Station Modifications consisting of: Relocate the existing Goodyear raw sewage pump station, construct wetwell, pad, site improvements, pumps, generator and automatic transfer switch electrical including panel, VFD and electrical systems, paint, piping and fencing, complete with appurtenances.
Posted Date
Oct 30, 2025
Due Date
Dec 2, 2025
Release: Oct 30, 2025
City of Valdosta
Close:
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Installation and construction of a sanitary sewage lift station, installation of about 2,200 LF of new gravity sanitary sewer, installation of about 5,800 LF of sewer force main, and other demolition, repair and patching, grading, grassing, and all related work. The Goodyear work consists of installation and construction of a sanitary sewage lift station, installation of about 500 LF of new gravity sanitary sewer, installation of about 750 LF of sewer force main, about 150 LF of watermain, and other demolition, repair and patching, grading, grassing, and all related work. Goodyear Pump Station Modifications consisting of: Relocate the existing Goodyear raw sewage pump station, construct wetwell, pad, site improvements, pumps, generator and automatic transfer switch electrical including panel, VFD and electrical systems, paint, piping and fencing, complete with appurtenances.
AvailableCity of Terre Haute
The contract will consist of the following: Rehabilitation (lining) via Cured-in-Place Pipe (CIPP) of approx. 3,130 LF of 20" force main, and replacement, via open cut, of approx. 540 LF of 18" force main, and new construction of approx. 95 LF of 24" and 20 LF of 30" gravity sewers via open cut; replacement of the existing Park Avenue Lift Station, including bypass pumping, removal of existing lift station equipment and associated structures, installation of new structures, piping, pumping equipment and associated appurtenances, and site improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
City of Terre Haute
Close: Dec 5, 2025
The contract will consist of the following: Rehabilitation (lining) via Cured-in-Place Pipe (CIPP) of approx. 3,130 LF of 20" force main, and replacement, via open cut, of approx. 540 LF of 18" force main, and new construction of approx. 95 LF of 24" and 20 LF of 30" gravity sewers via open cut; replacement of the existing Park Avenue Lift Station, including bypass pumping, removal of existing lift station equipment and associated structures, installation of new structures, piping, pumping equipment and associated appurtenances, and site improvements.
AvailableCity of Benton Harbor
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
City of Benton Harbor
Close: Dec 18, 2025
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
AvailableCity of Sturgeon
Improvements to the existing pump station to include upgrading electrical service from single phase to 3-phase, replacement of existing pumps/motors and controls with components compatible with 3-phase electric, and force main modifications.
Posted Date
-
Due Date
Dec 4, 2025
Release: -
City of Sturgeon
Close: Dec 4, 2025
Improvements to the existing pump station to include upgrading electrical service from single phase to 3-phase, replacement of existing pumps/motors and controls with components compatible with 3-phase electric, and force main modifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →