Retrieving RFP details
Release
Close
City of Phoenix
Work consists of lift station rehabilitation. Provide construction administration and inspection services for the rehabilitation of lift station. This project includes improvements and modifications to existing ductile iron pipe.
City of Brighton
Perform owner s advisor services for the lift station and force main progressive.
City of Largo
Work includes the installation of a new force main, running from the existing lift station 24, approximately 1400 lf along unimproved right of way, to tie into an existing 16" force main.
City of Phoenix
Work consists of lift station refurbishment. Work includes, construct new 0.66-mgd lift station to the north of the existing lift station site with new wet well, new duplex submersible pumps and control panel; new above ground discharge force main piping and components (flowmeter, pressure indicators, valves, air valves, surge mitigation, bypass connection, appurtenances, etc. ); new backup diesel generator, new electrical and instrumentation control cabinets including conduits and conductors on site; new 8-foot site walls with vehicle gate, paving and landscaping.
Release
Oct 23, 2025
Close
Nov 14, 2025