Summary
Upgrades to the existing lift station. The upgrades consist of installation of three new pumps along with new piping, isolation valves, check valves, and other piping appurtenances. It includes demolition of the building roof and a portion of the building shell to expose the existing wet well and then construction of a new roof over the remaining portion of the building (control room / dry well), as well as a new concrete slab (with access hatches) constructed over the wet well. The upgrades include installation of all new electrical equipment, and panels, an automatic transfer switch, a generator, interior and exterior lighting, a control panel, instruments, and all electrical and control appurtenances. Also included are new HVAC equipment, duct work, and plumbing elements. Finally, the upgrade includes site improvements such as an asphalt driveway, permanent and removable bollards, sidewalk, and a new fence around the generator and grade mounted HVAC equipment. All other scope items contained within or implied by the contract drawings and specifications are included in the overall project.