Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and replace the existing roofing system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Remove the existing roofing system and install a new, fully warranted roofing system at the building. Remove and properly dispose of existing roofing materials. Install new roofing system (specify type: e.g., TPO, EPDM, metal, etc.). Include insulation, flashing, drainage systems, and sealants.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Remove the existing roofing system and install a new, fully warranted roofing system at the building. Remove and properly dispose of existing roofing materials. Install new roofing system (specify type: e.g., TPO, EPDM, metal, etc.). Include insulation, flashing, drainage systems, and sealants.
Premium
Access the largest public sector contact database
New Construction of the Branch Library Building.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
New Construction of the Branch Library Building.
AvailableRemedy and repair water penetration with the library's roof.
Posted Date
Aug 21, 2025
Due Date
Jan 6, 2026
Release: Aug 21, 2025
Close: Jan 6, 2026
Remedy and repair water penetration with the library's roof.
AvailableSeeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
Posted Date
Dec 7, 2025
Due Date
Dec 29, 2025
Release: Dec 7, 2025
Close: Dec 29, 2025
Seeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis