Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
BD2627 Hilltop Service Building and Mosaic Community Campus Wildcat Roof
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for Roofing, Painting, and Electrical work related to Upper Campus Roof Replacement and Multi-Campus Improvements.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
This RFP is for Roofing, Painting, and Electrical work related to Upper Campus Roof Replacement and Multi-Campus Improvements.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove the existing roofing system and install a new, fully warranted roofing system at the building. Remove and properly dispose of existing roofing materials. Install new roofing system (specify type: e.g., TPO, EPDM, metal, etc.). Include insulation, flashing, drainage systems, and sealants.
Posted Date
Dec 2, 2025
Due Date
Jan 20, 2026
Release: Dec 2, 2025
Close: Jan 20, 2026
Remove the existing roofing system and install a new, fully warranted roofing system at the building. Remove and properly dispose of existing roofing materials. Install new roofing system (specify type: e.g., TPO, EPDM, metal, etc.). Include insulation, flashing, drainage systems, and sealants.
AvailableThe project entails the complete removal and replacement of the roof. Work shall include all architectural; principal features of the project include bulk ACM abatement; demolition of all existing roofing materials; and replacements with new components, as well as the removal and reinstallation of existing roof mechanical equipment as included within contract documents.
Posted Date
Nov 14, 2025
Due Date
Feb 10, 2026
Release: Nov 14, 2025
Close: Feb 10, 2026
The project entails the complete removal and replacement of the roof. Work shall include all architectural; principal features of the project include bulk ACM abatement; demolition of all existing roofing materials; and replacements with new components, as well as the removal and reinstallation of existing roof mechanical equipment as included within contract documents.
AvailableMaricopa County Community Colleges is soliciting bids to remove and replace multiple roof sections on Mesa Community College Building 50 with a new multiply SBS roofing system. The work includes insulation, flashing upgrades, drainage improvements, coating application, and associated roofing and mechanical adjustments as detailed in the specifications. A nonmandatory prebid meeting is scheduled on campus, and bids are due on January 13, 2026 at 2:00 PM MST.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Maricopa County Community Colleges is soliciting bids to remove and replace multiple roof sections on Mesa Community College Building 50 with a new multiply SBS roofing system. The work includes insulation, flashing upgrades, drainage improvements, coating application, and associated roofing and mechanical adjustments as detailed in the specifications. A nonmandatory prebid meeting is scheduled on campus, and bids are due on January 13, 2026 at 2:00 PM MST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →