Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 170 LF provide and install 18" RCP storm sewer by open cut, all depths, including bedding and backfill, complete as specified for; 4 EA provide and install four (4) type "a" storm sewer inlets; 1 EA provide and install one (1) type "E" storm sewer inlets; 1 EA provide and install one (1) storm sewer junction box; 1 LS construct grading and shaping of drainage swale; 410 SY demolish and legally dispose of existing gravel driveway; 575 SY provide and install 6" thick reinforced concrete pavement driveway including excavation, grading, compaction, lime/fly ash stabilized subgrade, and steel reinforcement; 495 SY provide and install 4" thick reinforced concrete sidewalk including subgrade preparation, reinforcing steel, scored joints and expansion joints, complete. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Chandler is soliciting Statements of Qualifications (RFQ WA2502.201) from qualified consultants to provide design and related professional services for rehabilitation of the Basha Water Production Facility and the Ocotillo and Pleasant wells, including assessments, design of tank/pumps/piping/electrical, permitting, and potential construction management. The project is anticipated to begin design in Spring 2026 with an expected construction budget in the $8M–$9M range. Solicitation documents are available on the Arizona Procurement Portal and SOQs are due February 18, 2026 at 3:00 p.m. Arizona Time (questions due Feb 4, 2026 by 5:00 p.m.).
Posted Date
Jan 15, 2026
Due Date
Feb 18, 2026
Release: Jan 15, 2026
Close: Feb 18, 2026
The City of Chandler is soliciting Statements of Qualifications (RFQ WA2502.201) from qualified consultants to provide design and related professional services for rehabilitation of the Basha Water Production Facility and the Ocotillo and Pleasant wells, including assessments, design of tank/pumps/piping/electrical, permitting, and potential construction management. The project is anticipated to begin design in Spring 2026 with an expected construction budget in the $8M–$9M range. Solicitation documents are available on the Arizona Procurement Portal and SOQs are due February 18, 2026 at 3:00 p.m. Arizona Time (questions due Feb 4, 2026 by 5:00 p.m.).
AvailableThe City of Olive Branch is seeking sealed bids for the construction of a new 750,000 GPD water production facility at the site of the existing Craft Road Elevated Water Storage Tank. The project scope includes the installation of piping, treatment equipment, housing, concrete work, and electrical improvements to make the facility fully functional. Bids are being accepted both physically at the City Clerk's office and electronically via the Central Bidding portal until February 23, 2026.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
The City of Olive Branch is seeking sealed bids for the construction of a new 750,000 GPD water production facility at the site of the existing Craft Road Elevated Water Storage Tank. The project scope includes the installation of piping, treatment equipment, housing, concrete work, and electrical improvements to make the facility fully functional. Bids are being accepted both physically at the City Clerk's office and electronically via the Central Bidding portal until February 23, 2026.
The Milwaukee Metropolitan Sewerage District (MMSD) requests engineering services to inspect three elevators at the Jones Island Water Reclamation Facility and to develop rehabilitation/specification documents. The scope includes site inspections, equipment evaluations, code compliance review, and preparation of construction-ready rehabilitation specifications. Proposals will be evaluated on qualifications, relevant experience, and technical approach, with deliverables separated into inspection/evaluation and specification development phases.
Posted Date
Jan 15, 2026
Due Date
Feb 13, 2026
Inspect and rehabilitate approx three (3) groundwater production wells and investigate/test pump one (1) groundwater production well. Work includes remove, inspect, and service motors and pumps, rehabilitate each well, equip each well with a pump and all other necessary equipment for flow testing (unless otherwise noted), maintain flow equipment during testing, and replace existing pump columns, if necessary. This work will also include flow testing two unequipped production wells.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Inspect and rehabilitate approx three (3) groundwater production wells and investigate/test pump one (1) groundwater production well. Work includes remove, inspect, and service motors and pumps, rehabilitate each well, equip each well with a pump and all other necessary equipment for flow testing (unless otherwise noted), maintain flow equipment during testing, and replace existing pump columns, if necessary. This work will also include flow testing two unequipped production wells.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Milwaukee Metropolitan Sewerage District (MMSD) requests engineering services to inspect three elevators at the Jones Island Water Reclamation Facility and to develop rehabilitation/specification documents. The scope includes site inspections, equipment evaluations, code compliance review, and preparation of construction-ready rehabilitation specifications. Proposals will be evaluated on qualifications, relevant experience, and technical approach, with deliverables separated into inspection/evaluation and specification development phases.