Open RFP

Lester R. Dingle Filter Media Replacement RFP

Description: The City Of Frederick is seeking proposals for the construction of the L. R. Dingle Water Treatment Plant Filter Media Replacement project. The goal of this request is to replace the existing filter media in (5) Pressure Vessel Filters at the water treatment plant, ensuring compliance with manufacturer installation recommendations and service quality.  The contractor is responsible for providing all necessary equipment, materials, and labor to complete this work. The Lester R. Dingle Filter Building was constructed in 1986 and contains 5 Vertical Dual Media Pressure Filters. The water source is a reservoir upstream from the building and averages 1 million gallons of potable water per day. The filter media was last replaced in 2000 and the last inspection conducted in 2018. The inspection report was good, and the media has had minimal loss over 26 years of use and daily backwash cycles. The inspection report noted that the internal header was in good condition and top media layer is level indicating a good underdrain system as well. The report did note that the media level was 4 inches below the designed level. Beginning January of 2027, the Lester R. Dingle Filter Building will be shut down for a complete rehabilitation project which will include new piping, valves, controls, electrical, and disinfection equipment with a projected start up in spring/summer of 2027. We need to have the filter media replaced due to being at the end of its useful life and surpassing the recommended life expectancy at the end of the current construction project before start up.

Buyer
City of Frederick

City · MD, US

Released
Nov 16, 2026
Closes
Dec 16, 2026(29 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts